首页> 外国专利> ... Prestressed Concrete Beam Having Holes for Arrangement of Bar and Construction Method Cross-beam of Bridge for using it

... Prestressed Concrete Beam Having Holes for Arrangement of Bar and Construction Method Cross-beam of Bridge for using it

机译:...带孔的预应力混凝土梁布置及施工方法横梁的使用方法

摘要

The present invention is blood. S. seeds, the main beam and the blood which is installed by throttling the direction of the bridge. S. seeds, more particularly, blood will be produced in ready-made material on how the construction of the cross beam is connected installed at regular intervals in the main beam . S. seed. by using left to form a reinforcement for a hole penetrating in the T axis direction perpendicular to the location where the cross beam is connected in the main beam is useful when cross beam installation, for good workability reduce speed and construction cost of the construction period At the same time, as one that structural stability is enhanced by the integration of the structure, blood, S. seeds at the same time providing a main beam for cross beam reinforced connecting through-hole and concrete fixing for key groove is formed, the blood S. Mr. the main beam ... P S's installation phase of the main beam, which through the use hayeoseo arranged parallel to the upper portion of the pier or abutment and; ... The blood S. seeds for cross beam reinforcement assembling while communication for inserting the main bars to the cross beam through holes of the main beam and a reinforcement phase; ... The blood S. seed grouting step of the through hole strayed into the through hole filled with a grout material of the main beam and methoxy; By pouring concrete on the outside of the cross beam reinforced assembly formed by the reinforcement phase of the cross beam for the reinforcement of blood S Mr concrete forming step of the cross beam connecting the main beams in a grid;... It provides a construction method for a cross beam of the bridge formed through.
机译:本发明是血液。 S.种子,主光束和通过节流桥方向安装的血液。 S.种子,尤其是血液,将以现成的材料产生,关于如何将横梁的结构以固定间隔安装在主梁中。 S.种子。在安装横梁时,通过使用左侧的钢筋在垂直于横梁在主梁中连接位置的T轴方向上穿透的孔形成加强筋,对于良好的可加工性,可降低施工周期的速度和施工成本同时,由于通过结构的整合增强了结构的稳定性,同时形成了血液,S。种子,为横梁加强了连接通孔的主梁并为键槽提供了混凝土固定,从而形成了血液。 S.主梁先生... PS的主梁安装阶段,它通过使用与桥墩或桥台上部平行布置的八重桥而完成;以及……用于横梁增强的血液S.种子在通过主梁的孔和增强相插入以将主杆插入横梁的同时进行组装。 ....将通孔的血S.种子灌浆步骤错入通孔中,该通孔中填充有主梁和甲氧基的灌浆材料;通过在由横梁的增强阶段形成的横梁增强组件的外部浇注混凝土以增强血液S,将主梁连接到网格中的横梁的混凝土形成步骤; ...提供一种构造方法用于形成穿过桥梁的横梁。

著录项

  • 公开/公告号KR100342932B1

    专利类型

  • 公开/公告日2002-07-05

    原文格式PDF

  • 申请/专利权人 NULL NULL;

    申请/专利号KR19990040375

  • 发明设计人 강희철;

    申请日1999-09-20

  • 分类号E01D19/12;

  • 国家 KR

  • 入库时间 2022-08-22 00:29:35

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号