首页> 外国专利> Construction method for open cutting tunnel

Construction method for open cutting tunnel

机译:明挖隧道施工方法

摘要

The present invention is to provide an installation tunnel construction method that can be constructed in the tunnel entrance to match the surrounding landscape by implementing the greening of the shaft cut surface early in building a driveway tunnel or railway tunnel in the mountainous area, In constructing a mountain tunnel with a section tunnel, a vertical plane is formed at the shaft position of the main tunnel and connected to the vertical plane to construct an open tunnel with an arch structure, filling soil on and around the open tunnel, and planting vegetation. After landscaping, excavate this tunnel to complete the tunnel.
机译:本发明提供了一种安装隧道施工方法,该方法可以通过在山区建造车道隧道或铁路隧道时尽早实施竖井切割面的绿化而在隧道入口中建造以匹配周围的景观。在具有分段隧道的山地隧道中,在主隧道的竖井位置形成一个垂直平面,并与该垂直平面相连,以构建具有拱形结构的明挖隧道,在明挖隧道上及其周围填充土壤,并种植植被。美化环境后,开挖该隧道以完成该隧道。

著录项

  • 公开/公告号KR100355946B1

    专利类型

  • 公开/公告日2002-10-12

    原文格式PDF

  • 申请/专利权人 주식회사 제일엔지니어링;

    申请/专利号KR19990062352

  • 发明设计人 강행언;

    申请日1999-12-24

  • 分类号E21D9/00;

  • 国家 KR

  • 入库时间 2022-08-22 00:29:23

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号