首页>
外国专利>
AFFORESTATION SOUNDPROOFING WALLS OF ROAD USING CONCRETE ASSEMBLY BLOCK
AFFORESTATION SOUNDPROOFING WALLS OF ROAD USING CONCRETE ASSEMBLY BLOCK
展开▼
机译:混凝土组合砌块的道路绿化隔音墙。
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to the soundproof wall of landscape green road using concrete V-type prefabricated block. More specifically, the concrete block is manufactured and installed in V-type, filled with soil and filled with empty space, and planted plants to secure the beauty of the road. The present invention relates to the soundproof walls of landscaping and greenery roads using concrete V-shaped prefabricated blocks to preserve ecosystems.;The present invention, in the soundproof wall structure of the road, the landscaping green soundproof wall is installed on the side of the pedestrian road to form a fence and soundproof wall structure, while the landscaping green soundproof wall is a structure that is seated on top of the foundation concrete, the foundation concrete There are a plurality of drain holes are installed in the upper center in the longitudinal direction of the block bearing concrete is formed in two rows, the block bearing concrete is formed in a structure inclined toward the center from the outside, the block bearing concrete is a prefabricated block at the top In the seated state, the joining band and the FRP anchor nail are fastened to each other. The prefabricated block is formed in a box structure through which the inner side is penetrated, and a plurality of through holes are formed at the upper and lower sides. In the above-mentioned prefabricated block, the F-Al anchor nail is fastened to the through hole, and the F-R anchor nail is assembled in the prefabricated block. The prefabricated blocks spaced apart with the joining band inserted between the through holes are fastened, and the joining bands are formed so that both ends are bent, and through holes are formed at both ends of the joining band, so After the anchor nail penetrates, the prefabricated block is filled with spaces in the space and the inner surface spaced apart, the soil is planted in the earth and sand, the greening structure is formed, and the prefabricated block is laminated in multiple layers. Water supply pipe is buried in the top soil, and a plurality of water injection holes are formed in the water supply pipe to form a structure for supplying water to the inside of the soil. Provide soundproof walls.
展开▼