首页> 外国专利> Building wall panel manufacturing method has foam panels fitted between hoops projecting from first reinforced concrete shell before embedding ends of hoops in second reinforced concrete shell

Building wall panel manufacturing method has foam panels fitted between hoops projecting from first reinforced concrete shell before embedding ends of hoops in second reinforced concrete shell

机译:建筑墙板的制造方法是在将箍的端部埋入第二钢筋混凝土壳之前,在从第一钢筋混凝土壳伸出的箍之间安装泡沫板。

摘要

The manufacturing method has a first reinforced concrete shell (5) provided with rows (3,4) of projecting hoops (2), between which foam panels (6,7) are fitted, with the ends of the hoops projecting beyond the foam panels coupled to a second reinforcement mesh, subsequently embedded in a second concrete shell (12) and the spaces between the edges (8,9) of the foam panels filled with concrete.
机译:该制造方法具有第一钢筋混凝土壳体(5),其具有成排的凸箍(2)的行(3,4),泡沫板(6,7)安装在其间,且箍的端部凸出泡沫板之外连接到第二加强网,随后嵌入第二混凝土壳(12)和泡沫板的边缘(8,9)之间的空间填充有混凝土。

著录项

  • 公开/公告号DE10047283C1

    专利类型

  • 公开/公告日2001-12-20

    原文格式PDF

  • 申请/专利权人 PRAETON INTERNATIONAL GMBH;

    申请/专利号DE20001047283

  • 发明设计人 CHRISTA BENEDIKT A.;

    申请日2000-09-23

  • 分类号B28B23/00;

  • 国家 DE

  • 入库时间 2022-08-22 00:27:28

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号