首页> 外国专利> Supple tube with spiral outer winding manufacturing procedure and plant uses two thermosetting materials cooled during extrusion and heated on assembly

Supple tube with spiral outer winding manufacturing procedure and plant uses two thermosetting materials cooled during extrusion and heated on assembly

机译:带有螺旋形外部绕组制造程序的软管和工厂使用两种热固性材料在挤压过程中冷却并在组装时加热

摘要

Making long lengths of tubing with spiral outer surface winding uses two continuously-extruded thermo-setting materials which are cooled during extrusion of tube and hollow spiral winding cord, then heated immediately after extrusion as they are assembled to fasten them together. The procedure for making long lengths of tubing with a spiral outer surface winding uses two continuously-extruded thermo-setting materials (A, B) which are cooled during the extrusion of the tube (1) and a hollow spiral winding cord (2), and then heated immediately after extrusion as they are assembled to fasten them together. The tube and winding are produced by two separate extrusion heads (5), with the spiral winding head rotating round the fixed tube extruding head, which has a die (14) at its outlet end, and is connected to a source (6) of a coolant fluid e.g. water. After the spiral winding has been applied to the tube the assembled components pass through a vulcanising kiln to polymerise them.
机译:使用螺旋形外表面缠绕法制造长管时,使用了两种连续挤压的热固性材料,这些材料在管材和空心螺旋缠绕线的挤压过程中进行冷却,然后在挤压后立即加热,将它们组装在一起以将它们固定在一起。使用螺旋形外表面缠绕制作长管的程序使用了两种连续挤压的热固性材料(A,B),它们在管子(1)的挤压过程中被冷却,而空心螺旋缠绕线(2)挤出后立即加热,然后将它们组装在一起以将它们固定在一起。管子和绕组由两个独立的挤出头(5)制成,螺旋缠绕头绕着固定管挤出头旋转,固定管挤出头的出口端有一个模头(14),并与源(6)连接。冷却液,例如水。在将螺旋绕组施加到管上之后,组装的组件将通过硫化窑以使其聚合。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号