首页>
外国专利>
Rail embedding process and tie plate for passage of rail track equipment comprises positioning and fixing rail on tie plate with bolts and then shuttering tie plate and pouring resin in shuttering
Rail embedding process and tie plate for passage of rail track equipment comprises positioning and fixing rail on tie plate with bolts and then shuttering tie plate and pouring resin in shuttering
The embedding process consists of fixing the rail on a tie plate and connecting the tie plate to a support. The rail is positioned by means of temporary equipment and fixed on the tie plate and adjusted in height and position by bolts (8,10) whose penetration depth is adjusted to come into contact with the support. The temporary equipment is then withdrawn and the tie plate is shuttered and resin (20) is poured into the shuttering.
展开▼