首页> 外国专利> Underground foundation construction material, underground foundation and its construction method

Underground foundation construction material, underground foundation and its construction method

机译:地下基础建材,地下基础及其施工方法

摘要

PROBLEM TO BE SOLVED: To save time and labor for boring a hole for constructing a ground foundation, to reduce a road surface after repairing the hole to make it inconspicuous, to and enable construction at a narrow site. SOLUTION: In this ground foundation, a pipe P inserted into a drilled hole 8 provided in the ground 7 by drilling, directing a pedestal 3 downward, and mortar M filled in the pipe P are pushed down by a core C till it is pushed out of the pipe P through between a hole of the pipe P and the pedestal part 2 pushed and expanded by the core C, so a pole H is set to stand as a lower end part of it is positioned by the mortar M filled between the drilled hole 8 and the pipe P, and a recessed part 6 in the core C reaching a lower end part of the pipe P, with the mortar M filled between the pipe P and the pole H.
机译:要解决的问题:节省在建造地面地基时打孔的时间和劳力,在修好孔以使其不显眼之后减少路面,以便在狭窄的地点施工。解决方案:在该地基中,将一根管子P通过钻孔插入地面7的钻孔8中,将基座3向下引导,并且填充在管子P中的砂浆M被芯C向下推,直到将其推出为止。通过在管子P的孔和由芯子C推动和扩展的基座部分2之间穿过管子P,从而将杆H设置为竖立,因为其下端部分由填充在钻头之间的砂浆M定位。孔8和管子P,以及芯子C中的凹入部分6到达管子P的下端部分,砂浆M填充在管子P和杆H之间。

著录项

  • 公开/公告号JP3396812B2

    专利类型

  • 公开/公告日2003-04-14

    原文格式PDF

  • 申请/专利权人 松永 和夫;

    申请/专利号JP20000100697

  • 发明设计人 松永 和夫;

    申请日2000-04-03

  • 分类号E02D27/42;E01F9/011;E01F13/00;E01F15/00;

  • 国家 JP

  • 入库时间 2022-08-22 00:20:07