首页> 外国专利> STRUT OPERATING TOOL IN EARTH RETAINING SUPPORT STRUCTURE OF EXCAVATED GUTTER

STRUT OPERATING TOOL IN EARTH RETAINING SUPPORT STRUCTURE OF EXCAVATED GUTTER

机译:开挖土方支护结构中的支杆操作工具

摘要

PROBLEM TO BE SOLVED: To provide a strut operating tool capable of surely and smoothly carrying out rolling operation of a strut.;SOLUTION: A waiting operating tool 7B has a first strut corbel 21 and a second strut corbel 22 as one body on the lower end of a bar material 15. The first strut corbel 21 is narrow and has an upward projection on the front end (wale member 3 side) and an arc-shaped corbel surface on the bar material 15 side. The second strut corbel 22 is formed in the shape of a plate and has the upward projection on the front end. When the waiting operating tool 7B is pulled out by placing a strut corbel 20 thereof under a strut 4, the strut 4 is lifted up by the first strut corbel 21 of the strut corbel 20 and the second strut corbel 22 and, at the same time, it is rotated upward with a second horizontal hinge bearing shaft 8d of the basic end bearing section 8 as the center. The strut 4 falls down from the first strut corbel 21 of the strut corbel 20 and the projection of the second strut corbel 22 in proper timing to put on the wale member 3 by rotating at an angle of 90°. By the constitution, the strut 4 is sheltered on the wale member 3 to enable an embedded pipe to lower from above.;COPYRIGHT: (C)2003,JPO
机译:解决的问题:提供一种能够可靠且平稳地进行支柱的滚动操作的支柱操作工具;解决方案:等待的操作工具7B在下部具有作为整体的第一支柱梁22和第二支柱梁22。杆材15的一端的第一支柱托梁21是狭窄的,并且在前端(威尔构件3侧)上具有向上的突起,并且在杆材15侧具有弧形的梁托表面。第二支柱梁22形成为板状,并且在前端具有向上的突起。当通过将其支柱梁20置于支柱4下而拉出等待操作工具7B时,支柱4由支柱梁20的第一支柱梁21和第二支柱梁22提起,并且同时然后,以基本端轴承部8的第二水平铰链轴承轴8d为中心向上旋转。支柱4在适当的时机从支柱梁20的第一支柱梁21和第二支柱梁22的突出部掉落,以通过旋转90°角而被放置在纵行构件3上。通过该构造,支柱4被遮盖在纵行构件3上,以使得嵌入的管能够从上方下降。版权所有:(C)2003,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号