首页> 外国专利> STEEL PIPE COLUMN SOIL RETAINING WALL, METHOD OF CONSTRUCTING THE RETAINING WALL, AND WATER CUT-OFF MEMBER USED FOR THE METHOD

STEEL PIPE COLUMN SOIL RETAINING WALL, METHOD OF CONSTRUCTING THE RETAINING WALL, AND WATER CUT-OFF MEMBER USED FOR THE METHOD

机译:钢制管柱土壤挡土墙,挡土墙的构造方法以及用于该方法的切水构件

摘要

PROBLEM TO BE SOLVED: To construct a steel pipe column soil retaining wall without removing soil.;SOLUTION: After steel pipe piles 1 are built into a ground at specified intervals 2 by rotating press-fitting or hammering, water cut-off members 3a formed by installing water cut-off bags 7 inflated by force-feeding fluid therein on steel materials 3a such as H-steels are press-fitted between steel pipe piles 1 and 1, and fluid is force-fed to inflate the water cut-off bags 7 so as to adhere to the outer surfaces of the steel pipe piles 1.;COPYRIGHT: (C)2003,JPO
机译:解决的问题:在不去除污垢的情况下构造钢管柱土壤挡土墙;解决方案:通过旋转压装或锤击以指定的间隔2将钢管桩1埋入地下后,形成了防水构件3a。通过在其中诸如H钢之类的钢材3a上安装通过向其中强制输送流体而膨胀的防水袋7,将其压配合在钢管桩1和1之间,并强制注入流体以使防水袋膨胀。 7,以便粘附到钢管桩1的外表面。版权所有:(C)2003,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号