首页> 外国专利> Contingency planning in a scheduling process

Contingency planning in a scheduling process

机译:计划过程中的应急计划

摘要

Tasks m such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area (2), are scheduled by means of a scheduler (10) at a work manager server (5). The scheduler provides schedule data (11) corresponding to schedules of the tasks that individual ones of the resources are to carry out, from task data (4) concerning the tasks to be carried out and resource data (6) concerning characteristics of resources available to carry out the tasks over a given period. The scheduled tasks are provided with associated contingency values (C) which are each computed as a function of the difference between the time that a task is scheduled to start and the latest start time that is feasible for the task . The schedule data (11) is downloaded to a workstation (7). The downloaded data is displayed on a Gantt Chart and the task blocks on the display are colour coded according to their contingency values (C) to give a visual indication of their values.
机译:由诸如现场工程师(E)之类的多种资源在地理区域( 2 )的不同位置执行的任务m,例如电信系统上的维修工作,是由以下时间安排的:工作管理器服务器( 5 )上的调度程序( 10 )的方式。调度程序从与要执行的任务有关的任务数据( 4 )中提供与各个资源要执行的任务的调度相对应的调度数据( 11 )。的资源数据( 6 )与可用于在给定期间内执行任务的资源特征有关。计划的任务具有关联的意外值(C),每个意外值都是根据计划开始任务的时间与该任务可行的最新开始时间之间的差来计算的。计划数据( 11 )被下载到工作站( 7 )。下载的数据显示在甘特图上,并且根据其意外值(C)对显示器上的任务块进行颜色编码,以直观地指示其值。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号