首页> 外国专利> Well completion process for formations with unconsolidated sands

Well completion process for formations with unconsolidated sands

机译:未固结砂岩的完井过程

摘要

A method for consolidating sand around a well, involving injecting hot water or steam through well casing perforations in to create a cement-like area around the perforation of sufficient rigidity to prevent sand from flowing into and obstructing the well. The cement area has several wormholes that provide fluid passageways between the well and the formation, while still inhibiting sand inflow.
机译:一种在井周围固结沙子的方法,该方法包括通过井套管穿孔注入热水或蒸汽,从而在穿孔周围形成水泥样的区域,使其具有足够的刚度以防止沙子流入并阻塞井。水泥区有几个虫洞,这些虫洞在井与地层之间提供了流体通道,同时仍然抑制了沙子的流入。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号