首页> 外国专利> The monitoring system of water to a high tension cable, and method of water monitoring for a monitoring system of water.

The monitoring system of water to a high tension cable, and method of water monitoring for a monitoring system of water.

机译:高压电缆水的监控系统,以及用于水监控系统的水监控方法。

摘要

"Monitoring system of water to a high tension cable, and method of water monitoring for a monitoring system of water".The invention is relating to a system of water monitoring and a method of monitoring of water for a high tension cable (CA) that includes a driver (4) and a screen (2) which surrounds the conductor.At least one first wire sensitive to water (11) extends on the screen (2) between the start of cable (CB) and the end of the cable (EC) and at least one second wire (12) is connected with the first wire (11) andXtremidade cable to form a complete circuit. A first switch unit (3) is provided between the beginning of the cable (CB) and the measuring circuit (MC).A control unit (Cu) controls the first switch unit (3) during a first time interval predetermined.A first switching condition in which the wire is sensitive to water (11) and the second wire (12) are connected to the potential of the screen.In a second time interval predetermined as follows,The control unit (Cu) controls the first switch unit (3) to a second switching condition in which the wire is sensitive to water (11) and the second wire (12) are disconnected from the potential of T.She.The measuring circuit (MC) is a measurement of the intrusion of water by performing resistance measurements or isolation, that is, measurements of voltage drop in the second time interval predetermined.Preferably the first predetermined time interval is too long, that is, 30 to 60 minutes of the second period, about 1 to 2 minutes.
机译:用于高压电缆的水的监控系统和用于水监控系统的水监控方法。本发明涉及一种用于高压电缆的水监控系统和水监控方法(CA)。 )包括一个驱动器(4)和一个围绕导体的屏蔽层(2)。至少一根对水敏感的第一线(11)在屏蔽层(2)上从电缆的始端(CB)到电缆末端之间延伸。电缆(EC)和至少一根第二导线(12)与第一导线(11)和Xtremidade电缆连接以形成完整电路。在电缆(CB)的始端和测量电路(MC)之间设有一个第一开关单元(3)。一个控制单元(Cu)在预定的第一时间间隔内控制该第一开关单元(3)。导线对水敏感的状态(11),第二导线(12)连接到屏幕的电位。在预定的第二时间间隔内,控制单元(Cu)控制第一开关单元(3 )到第二种开关状态,其中导线对水敏感(11),第二根导线(12)与T.She的电位断开。测量电路(MC)通过执行以下操作来测量水的侵入电阻测量或隔离,即在预定的第二时间间隔中的电压降测量。优选地,第一预定时间间隔过长,即第二周期的30至60分钟,约为1至2分钟。

著录项

  • 公开/公告号BR0113211A

    专利类型

  • 公开/公告日2003-06-10

    原文格式PDF

  • 申请/专利权人 PIRELLI KABEL UND SYSTEME GMBH & CO. KG;

    申请/专利号BR20010113211

  • 发明设计人 LOTHAR GOEHLICH;

    申请日2001-08-14

  • 分类号G01M3/16;G01R31/08;

  • 国家 BR

  • 入库时间 2022-08-22 00:03:48

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号