首页> 外国专利> PROCESS FOR CARRYING OUT LIME PILES

PROCESS FOR CARRYING OUT LIME PILES

机译:进行石灰桩的过程

摘要

The invention relates to a process for carrying out lime piles for reinforcing the highly deformable compressible soft soils by filling with lime and simultaneously compacting the same with a worm bit (2)in a previously drilled hole (1), in a dry rotary system with total or partial removal of the ground dug under the action of the compressed air introduced into the borehole, the borehole being carried out with a diameter of 200 mm and a penetration velocity correlated with the ground strength, the ground being dilocated entirely, followed by filling the drilled bore with a dry lime mixture containing 12...15% anhydrous lime, 20% cement, 65...68% sand, said mixture being compacted by rotating the worm reversely to the drilling direction, there beig formed a pile (8) of a diameter ranging from 280 to 400 mm, depending on the ground compressibility, said pile (8) having a bearing capacity of 6...8 t.
机译:本发明涉及在干式旋转系统中进行石灰桩的方法,该石灰桩通过填充石灰并同时用蜗杆钻头(2)在先前钻的孔(1)中压实石灰来加固高度变形的可压缩软土。在引入钻孔的压缩空气的作用下完全或部分去除挖出的地面,钻孔的直径为200 mm,穿透速度与地面强度相关,地面完全移位,然后填充用干燥的石灰混合物钻孔,该混合物包含12 ... 15%的无水石灰,20%的水泥,65 ... 68%的沙子,通过将蜗杆反向旋转至钻孔方向将其压实,在其中形成了一个桩(根据地面可压缩性,所述桩(8)的直径为280至400mm,所述桩(8)的承载能力为6 ... 8t。

著录项

  • 公开/公告号RO118026B1

    专利类型

  • 公开/公告日2002-12-30

    原文格式PDF

  • 申请/专利权人 ZUBLIN ROMÂNIA S.R.L.;

    申请/专利号RO20010000093

  • 发明设计人 HÂRSULESCU AUREL;CERNEA PETRE;

    申请日2001-01-26

  • 分类号E02D3/12;E02D5/36;E02D5/46;

  • 国家 RO

  • 入库时间 2022-08-22 00:01:20

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号