Piles and Footing Construction Method Using Caisson as Waterproofing Temporary Retaining Well and Concrete Form in Bridge Construction

机译:沉井防水临时固井及桥梁施工中桩基施工方法

摘要

PURPOSE: Provided is a process for constructing pile base by applying caisson structure as seepage barrier or temporary construction wall body and to utilize the structure as a cast for concrete introduction in digging in ground at a position for a sub-foundation of bridge. CONSTITUTION: The process comprises steps of placing a caisson(1) on a position of a ground to install a bridge pier; mounting the caisson at desired location by excavating the ground and sinking the caisson; re-filling earth and sand into the excavated hollow and constructing the pile; and using the caisson as a cast for introducing concrete into a base plate. A shoe(2) is mounted on front end of the caisson(1) and used to easily insert the caisson into the ground. The re-filling process is for eliminating problems caused by boiling or heaving states in sand/viscous earth such as clay grounds.
机译:目的:提供一种通过使用沉箱结构作为渗流屏障或临时建筑墙体来构造桩基的方法,并利用该结构作为浇筑混凝土的浇筑体,以便在桥梁的基础桩基的某个位置开挖地下。组成:该过程包括将沉箱(1)放置在地面上以安装桥墩的步骤;通过挖掘地面和沉沉沉箱将沉箱安装在所需位置;将土壤和沙子重新填充到挖出的空心中并建造桩子;并使用沉箱作为将混凝土引入底板的铸件。靴子(2)安装在沉箱(1)的前端,用于将沉箱轻松插入地面。重新填充过程是为了消除由沙/黏土(如粘土地面)中的沸腾或起伏状态引起的问题。

著录项

  • 公开/公告号KR20030003147A

    专利类型

  • 公开/公告日2003-01-09

    原文格式PDF

  • 申请/专利权人 KIM YOON SANG;

    申请/专利号KR20020066697

  • 发明设计人 KIM YOON SANG;

    申请日2002-10-30

  • 分类号E02D27/18;

  • 国家 KR