首页> 外国专利> METHOD OF ROCKS STORING INTO DUMP ON SLOPES IN STAGE MINING OF HIGHLAND DEPOSITS

METHOD OF ROCKS STORING INTO DUMP ON SLOPES IN STAGE MINING OF HIGHLAND DEPOSITS

机译:高地矿床开采边坡岩石堆积的方法。

摘要

FIELD: mining industry; applicable in opencast mining of highland deposits. SUBSTANCE: method includes storing of rocks into tiers by filling over horizontal, and displacement of tiers relative to one another by vertical. Working platforms of tiers on slope are formed from bottom upward, and they are located one after another. Filling is carried out in dump extension from atop within platform of several stages of storing with gradual reexcavation and performance of rock filling over horizontal with formation of main dump beyond opencast boundaries. Intermediate dumps in opencast contour are formed in the form of transportation strips expanding to opencast boundary, and when mining operations approach, they are gradually reexcavated with formation of exit from opencast by adjoining to horizontal part of road beyond opencast boundary. Rocks are stored into tiers in transition from one year season to the other and during liquid precipitation by formation of buffer from rocks between filling layers of different seasons and slope surface. EFFECT: efficient and safe dump formation in filling of rocks into tiers on slopes. 3 cl, 7 dwg
机译:领域:采矿业;适用于高地矿床的露天开采。实质:方法包括通过在水平上方填充将岩石存储到层中,以及垂直地将层相对于彼此进行位移。斜坡上各层的工作平台从下向上形成,并且一个接一个地放置。充填是在几个阶段的存储平台中从顶部的堆放处进行的,逐步进行开挖,并在水平方向上进行岩石填充,并形成超出露天边界的主要堆放物。露天轮廓的中间堆放物以扩展到露天边界的运输带的形式形成,当采矿作业接近时,通过与露天边界相邻的道路水平部分,逐渐形成露天矿的出口。从一年季节到另一个季节之间的过渡,以及在液体降水过程中,通过在不同季节的填充层和斜坡表面之间的岩石形成缓冲层,岩石被存储为分层。效果:有效,安全的排土场形成,可将岩石填充到斜坡上的各层中。 3厘升,7公升

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号