首页>
外国专利>
Method for preparing rail track with integral insulating sheet uses the rail track handling hoist to roll out the insulating sheet prior to placing of track lengths
Method for preparing rail track with integral insulating sheet uses the rail track handling hoist to roll out the insulating sheet prior to placing of track lengths
展开▼
机译:具有整体绝缘片的轨道的制备方法是,在设置轨道长度之前,使用轨道处理升降机将绝缘片铺开
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for preparing a rail track with integral insulating sheet in the ballast has rolls of insulating material carried on top of the stacks of track lengths, with the rolls held between the rails. The rolls are lifted off the stacks by an overhead lifting system, rotated through 90 deg and lowered onto the track bed. The overhead lifting system rolls out the insulating sheet onto the new bed and places the prepared track lengths directly onto the sheet to continue the track. The insulating rolls are moved outwards by more than a track length so as not to impede track laying. The track bed is completed by pouring ballast onto the insulating sheet.
展开▼