首页>
外国专利>
Construction method for a mixed pile in the ground uses driven mixer worm with outer tubing in bore hole to mix excavated material with binding agent for reproducible quality
Construction method for a mixed pile in the ground uses driven mixer worm with outer tubing in bore hole to mix excavated material with binding agent for reproducible quality
展开▼
机译:地下混合桩的施工方法是使用带孔的外管驱动蜗杆蜗杆,将挖掘的物料与粘合剂混合,以确保质量
展开▼
页面导航
摘要
著录项
相似文献
摘要
For the construction, a bore hole is made in the ground, and the excavated material is mixed within the hole with a binding agent or a suspension containing a binding agent, applied in doses during the mixing stage. Loosening and mixing is carried out by an internal rotating mixer element, e.g. a mixer worm (6) with drive (5a,b), within outer tubing (7) inserted into the ground (8). The tubing is withdrawn after completion of the mixing process. The mixer element extends over the full length of the tubing. During the mixing phase, it is axially moved within the tubing and/or its direction of rotation is reversed pref. several times.
展开▼