首页> 外国专利> Construction method for a mixed pile in the ground uses driven mixer worm with outer tubing in bore hole to mix excavated material with binding agent for reproducible quality

Construction method for a mixed pile in the ground uses driven mixer worm with outer tubing in bore hole to mix excavated material with binding agent for reproducible quality

机译:地下混合桩的施工方法是使用带孔的外管驱动蜗杆蜗杆,将挖掘的物料与粘合剂混合,以确保质量

摘要

For the construction, a bore hole is made in the ground, and the excavated material is mixed within the hole with a binding agent or a suspension containing a binding agent, applied in doses during the mixing stage. Loosening and mixing is carried out by an internal rotating mixer element, e.g. a mixer worm (6) with drive (5a,b), within outer tubing (7) inserted into the ground (8). The tubing is withdrawn after completion of the mixing process. The mixer element extends over the full length of the tubing. During the mixing phase, it is axially moved within the tubing and/or its direction of rotation is reversed pref. several times.
机译:对于该结构,在地面上钻一个孔,并且将挖掘出的材料在该孔内与粘合剂或包含粘合剂的悬浮液混合,并在混合阶段按剂量施用。松散和混合是通过内部旋转混合器元件(例如,混合器)进行的。在插入地面(8)的外管(7)内带有驱动器(5a,b)的搅拌器蜗杆(6)。混合过程完成后,将管道抽出。混合器元件在管道的整个长度上延伸。在混合阶段,它在管道内轴向移动和/或旋转方向相反。几次。

著录项

  • 公开/公告号DE10216952A1

    专利类型

  • 公开/公告日2003-10-23

    原文格式PDF

  • 申请/专利权人 HARALD GOLLWITZER GMBH;

    申请/专利号DE2002116952

  • 发明设计人 FUETTERER WOLFGANG;BACK EWALD;

    申请日2002-04-17

  • 分类号E02D5/38;

  • 国家 DE

  • 入库时间 2022-08-21 23:41:58

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号