Power plant starting method for compressed-air-energy-storage system involves preheating of fuel/oxidizer with auxiliary burner situated at outlet stream of recuperator
Power plant starting method for compressed-air-energy-storage system involves preheating of fuel/oxidizer with auxiliary burner situated at outlet stream of recuperator
展开▼
机译:压缩空气能量存储系统的发电厂启动方法包括在位于换热器出口处的辅助燃烧器对燃料/氧化剂进行预热
展开▼
页面导航
摘要
著录项
相似文献
摘要
The power plant has a recuperator (11) situated at inlet flow path (15) of gas to the turbo group (2) comprising turbine (3) and main burner (5). An auxiliary burner (19), situated at outlet stream of recuperator, preheats the fuel/oxidizer to be fed into the turbo group. An auxiliary compressor or blower (21) is arranged to supply the fuel/oxidizer, to be heated, into the auxiliary burner.