首页>
外国专利>
PERFORMANCE TEST SYSTEM OF PROTECTION RELAY
PERFORMANCE TEST SYSTEM OF PROTECTION RELAY
展开▼
机译:保护继电器性能测试系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a performance test system of protection relays for accurately and safely implementing a performance test of the protection relays respectively built in a plurality of distribution panels in a short time.;SOLUTION: In the distribution panels 101 to 10N, measured signals are inputted from continuous measuring instruments 3, 4 to the protection relay 1. Control relays 11 to 13 are provided, input a performance test input from the outside of the distribution panel to the protection relay and pull out a performance output to the outside of the distribution panel when the operation test is implemented. A protection relay tester 14 generates a performance test voltage/current and obtains the performance output. A sequencer 17 applies the performance test input from the protection relay tester in order of relay elements under control of the control relays. The protection relay tester inputs the performance output. A controller 14A controls the generation of the performance test voltage/current and measures a performance output time. A personal computer 15 generates a test start command and a test end command in order of the relay elements and stores an performance output time data. A printer 16 prints the data.;COPYRIGHT: (C)2004,JPO
展开▼
机译:要解决的问题:提供保护继电器的性能测试系统,以在短时间内准确安全地对分别安装在多个配电盘中的保护继电器进行性能测试。;解决方案:在配电盘中10 1 Sub>至10 N Sub>,测量信号从连续测量仪器3、4输入到保护继电器1。提供控制继电器11至13,从外部输入性能测试输入进行操作测试时,将配电盘连接到保护继电器,并将性能输出输出到配电盘的外部。保护继电器测试仪14产生性能测试电压/电流并获得性能输出。定序器17在控制继电器的控制下按继电器元件的顺序施加来自保护继电器测试器的性能测试输入。保护继电器测试仪输入性能输出。控制器14A控制性能测试电压/电流的产生并测量性能输出时间。个人计算机15按照继电器元件的顺序生成测试开始命令和测试结束命令,并存储演奏输出时间数据。打印机16打印数据。版权所有:(C)2004,JPO
展开▼