首页> 外国专利> LINING WORK METHOD OF SEGMENT AND POST MOUNTING SEGMENT OF CORROSION-PROOF PANEL

LINING WORK METHOD OF SEGMENT AND POST MOUNTING SEGMENT OF CORROSION-PROOF PANEL

机译:防腐蚀面板的分段和后安装分段的衬砌工作方法

摘要

PROBLEM TO BE SOLVED: To provide a lining method of a segment capable of omitting post works such as a hole filling work after assembly of the segments and reducing the secondary lining period and a post mounting segment of corrosion-proof panels used therefor.;SOLUTION: Segment bodies 10 on which a plurality of anchor grooves 11 are formed on the concrete surface of the inside face of a tunnel are assembled at first, when lining the inside face of the tunnel of the segments and then, corrosion-proof panels 20 having anchors 22 extending in the same direction with the anchor groove 11 corresponding to the anchor groove 11 are mounted.;COPYRIGHT: (C)2005,JPO&NCIPI
机译:解决的问题:提供一种能够在组装后省去诸如填孔工作并减少二次衬里时间的后段工作的段的衬里方法,以及为此使用的耐腐蚀面板的段安装段。 :首先,在衬砌各段隧道的内表面时,组装在隧道内表面的混凝土表面上形成有多个锚固槽11的段体10,然后组装具有以下结构的耐腐蚀板20:安装与对应于锚定槽11的锚定槽11在相同方向上延伸的锚定件22。版权所有:(C)2005,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号