首页> 外国专利> NUCLEAR POWER PLANT BUILDING AND CONSTRUCTION METHOD OF NUCLEAR POWER PLANT BUILDING

NUCLEAR POWER PLANT BUILDING AND CONSTRUCTION METHOD OF NUCLEAR POWER PLANT BUILDING

机译:核电站的建设及核电站的建设方法

摘要

PPROBLEM TO BE SOLVED: To set a floor buried article under a steel plate concrete floor without enlarging the joist size of the steel plate concrete even if the distance between facing walls is large in a nuclear power plant building. PSOLUTION: The steel plate concrete floor 12 is supported by a steel beam 13, and the steel beam 13 is burdened with placing pressure required for the joist 4, to thereby lower the height of the joist 4, and to secure a setting space for the floor buried article. PCOPYRIGHT: (C)2004,JPO
机译:

要解决的问题:即使在核电站建筑物中,面对墙之间的距离较大,也要在不增加钢板混凝土托梁尺寸的情况下,将地下埋入物放置在钢板混凝土地板下。

解决方案:钢板混凝土地板12由钢梁13支撑,并且钢梁13承受了托梁4所需的放置压力,从而降低了托梁4的高度并确保设置地板埋物的空间。

版权:(C)2004,日本特许厅

著录项

  • 公开/公告号JP2004177297A

    专利类型

  • 公开/公告日2004-06-24

    原文格式PDF

  • 申请/专利权人 TOSHIBA CORP;KAJIMA CORP;

    申请/专利号JP20020344770

  • 发明设计人 IMAI YOSHIKATSU;YOKOYAMA SHIGEKI;

    申请日2002-11-28

  • 分类号G21C13/00;E04B5/00;E04B5/40;E04H5/02;

  • 国家 JP

  • 入库时间 2022-08-21 23:31:38

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号