首页> 外国专利> In pad pile works modulo construction management manner and its device

In pad pile works modulo construction management manner and its device

机译:垫板桩工程模建管理方式及其装置

摘要

PROBLEM TO BE SOLVED: To install a ready-made pile in a satisfactory condition, grasping the change from excavation liquid to consolidation liquid correctly at the bottom of an excavated hole. ;SOLUTION: After an excavated hole 22 for installing a ready-made pile 24 is formed with the ground excavated to a specified depth with excavation liquid poured from the tip of an excavation rod 5, the excavation liquid is replaced by consolidation liquid 23. Then, the excavation rod 5 is drawn up while the consolidation liquid is poured to a specified depth. In a pile-embedding method as mentioned above, the excavation rod 5 is drawn up after detection is made with a sensor for the consolidation liquid at the bottom of the excavated hole 22.;COPYRIGHT: (C)1997,JPO
机译:解决的问题:要在令人满意的条件下安装现成的桩,请正确把握挖掘孔底部从挖掘液到固结液的变化。 ;解决方案:在从预制杆5的尖端倒入挖掘液的情况下,用预定的深度开挖地面以形成用于安装预制桩24的挖掘孔22,然后用固结液23代替挖掘液。然后,在将固结液体倒入指定深度的同时,向上拉动挖掘杆5。在如上所述的桩包埋方法中,在挖掘孔22的底部用用于固结液体的传感器进行检测之后,将挖掘杆5拉起; COPYRIGHT:(C)1997,JPO

著录项

  • 公开/公告号JP3476166B2

    专利类型

  • 公开/公告日2003-12-10

    原文格式PDF

  • 申请/专利权人 株式会社ジオトップ;

    申请/专利号JP19950203972

  • 发明设计人 細川 義隆;

    申请日1995-07-18

  • 分类号E02D7/26;E02D7/28;

  • 国家 JP

  • 入库时间 2022-08-21 23:29:18

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号