首页> 外国专利> CONSTRUCTION METHOD FOR UNDERWATER SHAFT, UNDERWATER SHAFT, CONNECTION METHOD FOR SHAFT AND ADIT, AND PIT STRUCTURE

CONSTRUCTION METHOD FOR UNDERWATER SHAFT, UNDERWATER SHAFT, CONNECTION METHOD FOR SHAFT AND ADIT, AND PIT STRUCTURE

机译:水下竖井的构造方法,水下竖井,竖井与地下室的连接方法以及坑结构

摘要

PPROBLEM TO BE SOLVED: To provide a construction method for an underwater shaft, an underwater shaft, a connection method for a shaft and an adit, and a pit structure that enable safety construction with no temporary structure and little influence on the environment. PSOLUTION: Steel pipe sheet piles 15 are erected in a seabed 19 so that upper ends are positioned in the water, a wale 25 is arranged along an inner circumference of a steel pipe well 16, and the inside of the steel pipe well 16 is excavated to form the underwater shaft 30. A J pipe 43 with a steel frame 45 is installed in the underwater shaft 30, a separating sheet 49 is set on steel pipe sheet piles 15b, and underwater concrete 63 is placed to fix the steel frame 45 and the J pipe 43 in the underwater shaft 30. The steel pipe sheet piles 15b with the separating sheet 49 are partly cut away, and a shield tunnel 75 is passed from the side of the underwater shaft 30. An arrival fitting 55 arranged at an end of the J pipe 43 is used to connect the shield tunnel 75 and the J pipe 43, and an outlet 77 is arranged at an upper end of the J pipe 43. PCOPYRIGHT: (C)2004,JPO
机译:

要解决的问题:提供一种用于水下竖井的施工方法,一种水下竖井,一种用于竖井和竖井的连接方法以及一种坑式结构,其使得能够进行安全施工而没有临时结构并且对环境的影响很小。 。

解决方案:将钢管板桩15竖立在海床19中,使其上端位于水中,在钢管井16的内周和钢管井的内部布置纵行25。挖出16个以形成水下竖井30。在水下竖井30中安装具有钢框架45的AJ管43,在钢板桩15b上放置分隔片49,并放置水下混凝土63以固定钢框架。水下轴30中的钢管45和J管43。带有分隔片49的钢管板桩15b被部分切除,并且屏蔽隧道75从水下轴30的侧面穿过。到达配件55布置在J管43的一端用于连接屏蔽隧道75和J管43,并且出口77布置在J管43的上端。

版权所有:(C)2004,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号