PROBLEM TO BE SOLVED: To increase vertical load to be burdened by one pile by propagating shearing force to support ground from a lower face of a protrusion of an existing pile and forming a support face on the support ground by a conical bottom face. ;SOLUTION: Pile holes of a shaft part (hole diameter D00) 2 and a bottom expansion part (hole diameter D11) 3 are digged (a). An existing concrete pile (shaft diameter D0) 4 forming annular ribs (outside diameter D1) 5, 6, 7 in a lower end part thereof is lowered into the pile hole 1, and cement milk (solidification strength of about 100 to 400 Kg/cm2 corresponding to the strength of support ground) is poured therein. After cement milk is solidified, a pile 10 in which the existing pile 4 is embedded into the bottom expansion part 3 of the pile hole 1 is constructed (b). The annular ribs 5, 6 are arranged in the bottom expansion part of the pile hole 1. When vertical load acts on the existing pile 4, shearing force is propagated at peripheral fringes of the annular ribs 5, 6 of the existing pile 4, and support pressure is generated in a part corresponding to a conical bottom face on a support ground surface 11.;COPYRIGHT: (C)1999,JPO
展开▼
机译:解决的问题:通过传播剪切力从现有桩的突出部的下表面支撑地面并通过圆锥形底面在支撑地面上形成支撑面,来增加一个桩承受的垂直载荷。 ;解决方案:挖出轴部(内径D 00 Sub>)2和底部扩展部(内径D 11 Sub>)3的桩孔(a)。将在其下端部分形成环形肋(外径D 1 Sub>)5、6、7的现有混凝土桩(轴直径D 0 Sub>)4降低到桩中在孔1中注入水泥浆(凝固强度约为100至400 Kg / cm 2 Sup>,与支撑地面的强度相对应)。水泥乳固化后,构成桩10,在该桩10中将现有的桩4埋入桩孔1的底部膨胀部3中(b)。环形肋5、6布置在桩孔1的底部扩展部分中。当垂直载荷作用于现有桩4时,剪切力在现有桩4的环形肋5、6的外围边缘处传播,并且在对应于支撑底表面11上的圆锥形底面的部分中产生支撑压力;版权所有:(C)1999,JPO
展开▼