首页> 外国专利> System to clarify where responsibility is after elucidating the cause of an accident at a nuclear power plant

System to clarify where responsibility is after elucidating the cause of an accident at a nuclear power plant

机译:阐明核电站事故原因后明确责任的系统

摘要

PROBLEM TO BE SOLVED: To elect fair persons without cozy relation with parties concerned in relation with the construction for nuclear power station as an orderer by negotiating with electric power company and the like by taking opinions of local residents. SOLUTION: A reactor power station management system has in the constitution a reactor computer, a construction computer and a maintenance and control computer. The reactor computer records a contract made between orderer in fair position elected by the will of local residents and a reactor manufacturer based on the negotiation with an electric power company and transmits it to a computer managed by the reactor vender. The construction computer records the contract exchanged between the orderer and the construction farm and transmits it to the computer managed by the construction farm. The maintenance and control computer operates the reactor power station and records data formed by the electric company responsible for its maintenance and control.
机译:解决的问题:通过与电力公司等进行谈判,并征询当地居民的意见,选出与有关建设核电站的当事方没有友好关系的公正人士。解决方案:反应堆电站管理系统在结构上具有反应堆计算机,建筑计算机和维护与控制计算机。反应堆计算机根据与电力公司的谈判记录由当地居民意愿选择的处于公平位置的订购者与反应堆制造商之间订立的合同,并将该合同传送到由反应堆卖方管理的计算机。施工计算机记录订购者和施工农场之间交换的合同,并将合同传输到施工农场管理的计算机。维护和控制计算机操作反应堆电站,并记录负责维护和控制的电力公司形成的数据。

著录项

  • 公开/公告号JP3485553B2

    专利类型

  • 公开/公告日2004-01-13

    原文格式PDF

  • 申请/专利权人 佐藤 通洋;

    申请/专利号JP20010314850

  • 发明设计人 佐藤 通洋;

    申请日2001-10-12

  • 分类号G21C13/00;G21C17/003;G21D3/00;

  • 国家 JP

  • 入库时间 2022-08-21 23:24:45

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号