首页> 外国专利> Method and apparatus for measuring optimality for master production schedules

Method and apparatus for measuring optimality for master production schedules

机译:测量主生产计划的最优性的方法和设备

摘要

A method for evaluation of optimality of a master production schedule begins by obtaining a forecasted operation schedule, the master production schedule, and an operation completion time. A master production schedule variance is determined from the master production schedule and the operation completion time. Then, a forecasted operation schedule variance is determined from the forecasted operation schedule and the operation completion time. An optimality index is an indicator of the optimality of the master production schedule, which is determined as a function of the operation schedule variance to the forecasted schedule variance. A penalty for deviation of the operation completion time deviation from the master production schedule may be incorporated into the determination. A third embodiment of the method evaluates the concentration/dispersion of the master production schedule variance and provides a better optimality index for a more concentrated distribution of the planned operation index.
机译:一种用于评估主生产计划的最优性的方法开始于获得预测的操作计划,主生产计划和操作完成时间。根据主生产计划和操作完成时间确定主生产计划差异。然后,根据预测的作业时间表和作业完成时间来确定预测的作业时间表偏差。最佳性指标是主生产进度计划最佳性的指标,该指标是根据操作进度变化率对预测进度变化率来确定的。可以将对操作完成时间偏差与主生产计划的偏差的惩罚并入确定中。该方法的第三实施例评估主生产计划差异的集中/分散,并为计划的运营指标的更集中分布提供更好的最优指标。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号