首页> 外国专利> Efficient process for time dependent network model in an energy market simulation system

Efficient process for time dependent network model in an energy market simulation system

机译:能源市场仿真系统中时变网络模型的高效过程

摘要

A method and system for efficiently simulating an electric power transmission network is disclosed. In the method, a parameterized value is assigned to an element in the network that is present during any time interval of a simulation test period. If an element in the network has changed from a preceding time interval, the network of the preceding time interval is updated by changing the parameterized value for the changed element, and the updated network is simulated. If any element in the network has not changed from the network of the preceding time interval, the network is simulated based on the network of the preceding time interval.
机译:公开了一种用于有效地模拟电力传输网络的方法和系统。在该方法中,将参数化的值分配给在模拟测试周期的任何时间间隔内存在的网络中的元素。如果网络中的某个元素已从前一个时间间隔更改,则通过更改更改后元素的参数化值来更新前一个时间间隔的网络,并模拟更新后的网络。如果网络中的任何元素都没有更改前一个时间间隔的网络,则根据前一个时间间隔的网络对网络进行仿真。

著录项

  • 公开/公告号US2004153303A1

    专利类型

  • 公开/公告日2004-08-05

    原文格式PDF

  • 申请/专利权人 TANG LE;FENG XIAOMING;

    申请/专利号US20030744386

  • 发明设计人 LE TANG;XIAOMING FENG;

    申请日2003-12-23

  • 分类号G06F17/50;

  • 国家 US

  • 入库时间 2022-08-21 23:19:12

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号