首页> 外国专利> Method for updating an earth model using measurements gathered during borehole construction

Method for updating an earth model using measurements gathered during borehole construction

机译:使用钻孔施工期间收集的测量值更新地球模型的方法

摘要

A method and system for real time updating of an earth model. The efficiency with which an oil or gas well is constructed can be enhanced by updating the relevant earth model using real-time measurements of the effective density of the drilling fluid and other parameters. The method includes generating an earth model used for predicting potential problems in drilling of a borehole having a predetermined trajectory. Evaluations of the state of the borehole and local geological features are obtained which are based on the earth model. Real time data is used to create a diagnosis of the state of the borehole and local geological features. The evaluations are compared with a diagnosis to identify inconsistencies. A component of the earth model is identified that is both related to the identified inconsistency and has a high degree of uncertainty. The selected component of the earth model is then updated prior to completing construction of the borehole using the received data.
机译:一种实时更新地球模型的方法和系统。通过使用钻井液有效密度和其他参数的实时测量值更新相关的地球模型,可以提高建造油井或气井的效率。该方法包括生成用于预测具有预定轨迹的钻孔的潜在问题的地球模型。基于地球模型,可以获得对钻孔状态和局部地质特征的评估。实时数据用于创建井眼状态和局部地质特征的诊断。将评估结果与诊断结果进行比较,以识别不一致之处。确定了地球模型的一个组成部分,该组成部分既与所确定的不一致有关,又具有高度的不确定性。然后,在使用接收到的数据完成钻孔施工之前,更新地球模型的选定组件。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号