首页> 外国专利> METHOD FOR PRODUCING CLIMEABLE OR PASSABLE LINEAR HOLLOW SECTION ENGINEERING STRUCTURE, ESPECIALLY FOR SEWER, PIPELINE, DUCT OR SIMILAR PREFABRICATED TUBE FROM CONCRETE OR REINFORCED CONCRET, AS WELL AS EQUIPMENT AND PIPE FOR THE EFFECTUATION OF THE

METHOD FOR PRODUCING CLIMEABLE OR PASSABLE LINEAR HOLLOW SECTION ENGINEERING STRUCTURE, ESPECIALLY FOR SEWER, PIPELINE, DUCT OR SIMILAR PREFABRICATED TUBE FROM CONCRETE OR REINFORCED CONCRET, AS WELL AS EQUIPMENT AND PIPE FOR THE EFFECTUATION OF THE

机译:用于制造可水泥化或可通过的线性空心截面工程结构的方法,特别是用于混凝土,钢筋混凝土的下水道,管道,管道或类似预制管以及用于实现该目的的设备和管道的方法

摘要

during the procedure, the csu0151elemeket (3a) is flexibly deformable tu00f6mu00edtu00e9sku00f6zbeiktatu00e1su00e1val, fell in love tolu00e1sukkal or / and hu00fazu00e1sukkal egymu00e1shozcsatlakoztatju00e1k.the essence of the procedure is that the linear mu00e9rnu00f6kimu0171tu00e1rgy, for example, the csu0151elemek channel (3a) and a vertical szu00e1mu00e1raoldaliru00e1nyu00fa ku00e9nyszervezetu00e9st insurance effect, lower fixenbeu00e9pu00edtett vezetu0151szerkezetekkel (6a, 6b) of which (4) is moved alu00e9pu00edtmu00e9nyen ho cooperating with the fixed ssziru00e1nyban, beu00e9pu00edtettfelsu0151 vezetu0151szerkezeteket (7a, 7b) containing csu0151elemeket (3a).according to the characteristic of atalu00e1lmu00e1ny device for prefabricated concrete block csu0151elemek (iron) and (3a) of an felfektetu00e9su00e9re mu00e9rnu00f6kimu0171tu00e1rgy longitudinal lateral u00e9smagassu00e1gi effect during the mozgatu00e1suk ku00e9nyszervezetu00e9su00fcket insurance, permanently installed alsu00f3vezetu0151szerkezeteket (6a, 6b) alu00e9pu00edtmu00e9nye containing (4), and csu0151elemek (3a) talpru00e9szu00e9be (17) permanently installed.the alsu00f3vezetu0151szerkezetekkel (6a, 6b) cooperating upper vezetu0151szerkezetekkel (7a, 7b) is provided. according to the invention csu0151elemnek is the idea that the flakes (17) in the middle and lower felu00fcletu00e9be longitudinal grooves (8) are the same distance from bemu00e9lyu00edtve whose lateral walls (3a) are the u00e9spu00e1rhuzamosan csu0151elem longitudinal vertical geometriaiku00f6zu00e9psu00edkju00e1val.the grooves (8) to the gates of the csu0151elem side (3a) fixed betonanyagu00e1ba a hard material, preferably a alu00e9pu00edtmu00e9nyben acu00e9lbu00f3lku00e9szu00fclt, (4) a fixed cam alsu00f3oldalvezetu0151 ele - meivel (6a ', 6b' ') cooperating with the upper oldalvezetu0151elemek (7a, 7b,' ',' ') are aligned.the grooves (8) of the two side falu00e1tu00f3lkiindulva csu0151elem (3a) fenu00e9kru00e9szu00e9nek (17), the lower plane of the immediate vicinity, in parallel with the hard material, preferably steel, a alu00e9pu00edtmu00e9nyben ru00f6gzu00edtettvezetu0151pu00e1lya leads to a lower height (4) - he's shifting elements (6a ', 6b') cooperating upper height leading - shifting elements (7a, 7b '), preferably sheets are located inwhich are tied up in fixed acsu0151elem (3a) and which betonanyagu00e1ba, out of the nyu00f6sen flakes (17) on the outer surface of the felfekvu0151 u00e9lu00e9ig spreading. the flakes (17) on both sides at an angle out of amelybehossziru00e1nyu00fa rising surfaces, preferably has a trapezoidal szelvu00e9nyu0171 hornyokvannak bemu00e9lyu00edtve widening outwards. a
机译:在此过程中,cs u0151elemeket(3a)可以灵活变形t u00f6m u00edt u00e9sk u00f6zbeiktat u00e1s u00e1val,坠入爱河而已 u00e1sukkal或 /和 h u00eze u00e1atsuatkal。该过程的本质是线性m u00e9rn u00f6kim u0171t u00e1rgy,例如,cs u0151elemek通道(3a)和垂直sz u00e1m u00e1raoldalir u00e1ny u00fa k u00e9nyszervezet fixenbe u00e9p u00edtett vezet u0151szerkezezetekkel(6a,6b),其中(4)已与固定的sszir u00e1nyban,be u00e9p u7eet {ezepet u00e9p u00ed1ett(0) ),其中包含cs u0151elemeket(3a)。根据预制混凝土砌块cs u0151elemek(铁)和(3a)预制混凝土砌块的atal u00e1lm u00e1ny设备的特性,m u00e9rn u00f1kir u00e1r莫扎特河期间的纵向横向 u00e9smagass u00e1gi效果 u00e1suk k u00e9nyszervezet u 00e9s u00fcket保险,已永久安装的als u00f3vezet u0151szerkezeteket(6a,6b)al u00e9p u00edtm u00e9nye包含(4),而cs u0151elemek(3a)talpr u00e9sz u00e9als(17)已安装。提供了协作的上vezet u0151szerkezetekkel(7a,7b)。根据本发明,是这样的想法,即,在中部和下部的薄片(17)中的纵向凹槽(8)与侧壁(3a)是侧壁的边(bem)具有相同的距离。 husmosan cs u0151元素纵向垂直几何形状 c0015元素侧(3a)的浇口处的凹槽(8)固定好,最好是硬质材料 u00e9nyben ac u00e9lb u00f3lk u00e9sz u00fclt,(4)固定凸轮als u00f3oldalvezet u0151 ele-meivel(6a',6b'')与上部oldalvezet u0151elemek(7a,7b, ')对齐。两侧fal u00e1t u00f3lkiindulva cs u0151elem(3a)fen u00e9kr u00e9sz u00e9nek的凹槽(8)与硬质材料平行,最好是钢,al u00e9p u00edtm u00e9nyben r u00f6gz u00edtettvezet u0151p u00e1lya导致高度降低(4)-他的换挡元件(6a',6 b')与上部高度引导-转换元件(7a,7b')配合使用,最好将其放置在固定的acs u0151elem(3a)中,并将其从ny u00f6sen薄片(17)中分离出来。 felfekv u0151 u00e9l u00e9ig的外表面展开。薄片(17)的两边与amelybehosszir的上升表面成一定角度,最好具有梯形的szelv hornyokvannak bem。一种

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号