Pile construction method, especially for concrete piles, by placing hollow body for filling with filler material inside tube and then driving body and tube into ground
Pile construction method, especially for concrete piles, by placing hollow body for filling with filler material inside tube and then driving body and tube into ground
展开▼
机译:桩的施工方法,特别是对于混凝土桩,是通过将空心体放入填充材料填充到管内,然后将管体打入地下
展开▼
页面导航
摘要
著录项
相似文献
摘要
A hollow body (4) is placed inside an insertion tube (3) and then pressed into the ground with the tube, after which the tube is removed, leaving the hollow body in the ground, which can then be filled with a filler material, e.g. concrete.