首页> 外国专利> Pile construction method, especially for concrete piles, by placing hollow body for filling with filler material inside tube and then driving body and tube into ground

Pile construction method, especially for concrete piles, by placing hollow body for filling with filler material inside tube and then driving body and tube into ground

机译:桩的施工方法,特别是对于混凝土桩,是通过将空心体放入填充材料填充到管内,然后将管体打入地下

摘要

A hollow body (4) is placed inside an insertion tube (3) and then pressed into the ground with the tube, after which the tube is removed, leaving the hollow body in the ground, which can then be filled with a filler material, e.g. concrete.
机译:将空心体(4)放置在插入管(3)内,然后将其与管子一起压入地下,然后将其取下,将空心体留在地下,然后用填充材料填充空心体。例如具体。

著录项

  • 公开/公告号NL1022431C2

    专利类型

  • 公开/公告日2004-07-22

    原文格式PDF

  • 申请/专利权人 GEOTECHNICS B.V.;

    申请/专利号NL20031022431

  • 发明设计人 NICO GERHARD CORTLEVER;

    申请日2003-01-20

  • 分类号E02D5/38;E02D27/16;

  • 国家 NL

  • 入库时间 2022-08-21 23:09:41

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号