ENHANCED MONITORING OF INDUSTRIAL PROJECT PROVISIONING

机译:加强对工业项目供应的监控

摘要

A table is set up for each product over a series of time periods starting at a set time. From the start time to the end of the specific period, the table gives a first quantity of site requirements and a second quantity of stock and orders with the orders offset by a delay. A risk of supply line rupture and/or a need to start supply is identified when the second quantity falls below the first Each project (Pi) on a client site is associated with a dated list of product requirements (Ii, ti) at the same time holding a list of stocks (Sj, tj) and orders (Ak, tk) for these products. In addition the quantities are recalculated for a different time origin to define a moment where the first and second quantities are equal. These calculations are reiterated in the presence of determined events such as modification of the client project date, modification of a client use date, modification of a supply delay time from the supplier, modification of the quantities required, passage of an order from the client to the supplier, confirmation of an order, reservation of product in stock and/or delivery of a product. The check on when the second quantity falls below the first includes taking into consideration an order at the latest on the start date of the project, increased by an availability delay and reduced by a supply delay. The requirements, stock and purchases are classed by product and by date of effect. The requirements for each product are accumulated for each time period to form the first table and the stocks and deliveries foreseen for each product to form the second table. Independent claims are included for the following: (i) a computer system containing this information, specifically the two tables and means of comparing them as described above; and (ii) a computer program, possibly written using object-based programming, to carry out the above process, including object classes of item, stock, purchases, table element (containing a quantity and time) and project.
机译:从设定的时间开始,在一系列时间段内为每种产品建立一个表格。从开始时间到特定时间段的结束,该表给出了站点需求的第一数量以及库存和订单的第二数量,其中订单被延迟抵消。当第二个数量低于第一个数量时,将识别出供应线破裂的风险和/或需要开始供应的风险。客户站点上的每个项目(Pi)都与同一日期的已过时的产品需求列表(Ii,ti)相关联持有这些产品的库存(Sj,tj)和订单(Ak,tk)清单的时间。另外,针对不同的时间起点重新计算数量,以定义第一数量和第二数量相等的时刻。在确定事件的存在下重复这些计算,例如更改客户项目日期,更改客户使用日期,更改来自供应商的供应延迟时间,更改所需数量,将订单从客户传递给客户供应商,订单确认,产品库存保留和/或产品交付。关于第二数量何时低于第一数量的检查包括考虑到最迟在项目开始日期的订单,该订单因可用性延迟而增加,而由于供应延迟而减少。需求,库存和购买按产品和生效日期分类。在每个时间段内对每种产品的需求进行累加以形成第一张表,并为每种产品预见库存和交货以形成第二张表。包括以下方面的独立权利要求:(i)包含此信息的计算机系统,特别是如上所述的两个表格和比较它们的方法; (ii)可能使用基于对象的程序编写的计算机程序,以执行上述过程,包括项目的对象类别,库存,购买,表格元素(包含数量和时间)和项目。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号