首页>
外国专利>
METHOD FOR CLOCK TREE SYNTHESIS AND METHOD FOR FORCASTING THE EFFECT OF CLOCK TREE SYNTHESIS
METHOD FOR CLOCK TREE SYNTHESIS AND METHOD FOR FORCASTING THE EFFECT OF CLOCK TREE SYNTHESIS
展开▼
机译:时钟树的合成方法和预测时钟树的效果的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A method for synthesizing a clock tree and an estimating method of a clock tree synthesis effect are provided to synthesize the clock tree in case that a gated clock or a multi-clock source is present, and previously obtain the information for the clock tree synthesis effect before a layout process. CONSTITUTION: A clock route is fixed and a clock net is analyzed(S3). If a problem occurs in the clock tree synthesis, the clock net is analyzed again by setting a user synchronization pin and a user ignorance pin(S5). If not, an automatic clock tree cell is inserted(S6). A delay time is calculated by using the inserted clock tree cell(S7). The timing is verified before the layout by using a calculation result(S8). If a verification result is normal, an information file for the clock tree synthesis is output(S9). The clock tree synthesis is performed on the layout(S10).
展开▼