首页>
外国专利>
IMPROVEMENT METHOD FOR ENHANCING STRENGTH OF SOFT GROUND USING ECO-FRIENDLY DRAINAGE MEMBER, VERTICAL/HORIZONTAL DRAINAGE MEMBER USED FOR IMPROVEMENT METHOD, AND REAL-TIME MONITORING SYSTEM FOR MONITORING IN REAL TIME IMPROVEMENT EFFECT BY IMPROVEMENT METHOD USING ARTIFICIAL SATELLITE
IMPROVEMENT METHOD FOR ENHANCING STRENGTH OF SOFT GROUND USING ECO-FRIENDLY DRAINAGE MEMBER, VERTICAL/HORIZONTAL DRAINAGE MEMBER USED FOR IMPROVEMENT METHOD, AND REAL-TIME MONITORING SYSTEM FOR MONITORING IN REAL TIME IMPROVEMENT EFFECT BY IMPROVEMENT METHOD USING ARTIFICIAL SATELLITE
PURPOSE: An improvement method for enhancing the strength of the soft ground using an eco-friendly drainage member is provided to prevent the soil pollution of the soft ground and to maximize the construction efficiency on the soft ground. CONSTITUTION: The improvement method for enhancing the strength of the soft ground using an eco-friendly drainage member comprises the steps of: forming a fitting space using a placer to interpose a vertical drainage member(100) composed of a straw rope(10) and a filter(20) to the soft ground; interposing a vertical drainage member(100) to the fitting space; paving a horizontal drainage member composed of a rice-straw mat and bamboo on the surface of the soft ground; banking up soil on the horizontal drainage member; draining off pore water to an upper horizontal drainage member by moving underground pore water of the soft ground upward through the vertical drainage member; and draining off the underground pore water flew from the horizontal drainage member to the surface layer.
展开▼