首页>
外国专利>
EXTENSION TUNNEL USING EXISTING TUNNEL CONSTRUCTED ON ROCK AND CONSTRUCTION METHOD FOR IMPROVING WORK EFFICIENCY BY SUITABLE EXCAVATOR
EXTENSION TUNNEL USING EXISTING TUNNEL CONSTRUCTED ON ROCK AND CONSTRUCTION METHOD FOR IMPROVING WORK EFFICIENCY BY SUITABLE EXCAVATOR
展开▼
机译:利用现有岩石施工隧道延长隧道及提高适宜挖土机工作效率的施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A construction method for an extension tunnel using the existing tunnel constructed on rock is provided to improve work efficiency by using a suitable excavator for rock, to prevent the congestion of traffic at an extension work for a tunnel, and to reduce the cost and period of construction by utilizing the existing tunnel. CONSTITUTION: The construction method for an extension tunnel(20) using an existing tunnel(10) constructed on rock comprises the steps of: installing a housing(60) by digging a half length of the housing(60) through the soil on the lining of the existing tunnel(10) using a hydraulic jack gradually; installing an excavator(40) attached with an auger excavator(70) on a support(61) and perforating an unit excavation hole by stage; forming an extension tunnel wall(30) by assembling/installing a reinforcing bar in the unit excavation hole and placing concrete; removing soil between the existing tunnel lining and the extension tunnel wall(30); finishing up an extension work for a tunnel by repeating above steps; and adjusting the road surface and installing lightings in a tunnel.
展开▼