首页> 外国专利> THE SIMULTANEOUS CONSTRUCTION METHOD OF BUILDING HAVING MIXED STRUCTURE OF REINFORCED CONCRETE CONSTRUCTION AND STEEL FRAMED REINFORCED CONCRETE STRUCTURE

THE SIMULTANEOUS CONSTRUCTION METHOD OF BUILDING HAVING MIXED STRUCTURE OF REINFORCED CONCRETE CONSTRUCTION AND STEEL FRAMED REINFORCED CONCRETE STRUCTURE

机译:钢筋混凝土结构与钢框架混凝土混合结构房屋同时施工方法

摘要

PURPOSE: A construction method for a building structure having a mixed structure of a reinforced concrete structure and a steel-frame reinforced concrete structure is provided to shorten a period of construction and to reduce construction expenses. CONSTITUTION: The construction method for a building structure having a mixed structure of a reinforced concrete structure and a steel-frame reinforced concrete structure comprises the steps of: executing a framework on the lower part of a building structure with a reinforced concrete structure; constructing from the beginning of an intermediate part to the uppermost part of an intermediate part with a steel frame; while executing a framework between the part where a steel-frame structure of an intermediate part is started and the uppermost part of an intermediate part, executing a framework from the beginning of an upper part toward a roof layer with a reinforced concrete structure.
机译:目的:提供一种具有钢筋混凝土结构和钢框架钢筋混凝土结构的混合结构的建筑结构的施工方法,以缩短施工周期并减少施工费用。构成:一种具有钢筋混凝土结构和钢框架钢筋混凝土结构的混合结构的建筑结构的施工方法,包括以下步骤:在具有钢筋混凝土结构的建筑结构的下部执行框架;从中间部分的开始到中间部分的最上部构造有钢框架。在开始中间部分的钢框架结构的部分与中间部分的最上部之间执行框架的同时,从上部的开始朝向具有钢筋混凝土结构的顶层执行框架。

著录项

  • 公开/公告号KR100442548B1

    专利类型

  • 公开/公告日2004-07-30

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20030037296

  • 发明设计人 유송간;

    申请日2003-06-10

  • 分类号E04B1/30;

  • 国家 KR

  • 入库时间 2022-08-21 22:46:50

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号