首页> 外国专利> Prestressed composite double-T girder bridge

Prestressed composite double-T girder bridge

机译:预应力组合双T梁桥

摘要

For the pouring of the mold at the time of construction in the existing PSC (Pre-Stressed Concrete) box or PSC construction of a double T-shaped bridge was necessary process of installing and dismantling the formwork Shore (Stand for placement of the mold). To do this is a need for many on-site working conditions in the field is also acting as much of variables. For example, it should introduce the other uneconomic method of using large equipment because the roads and rivers passing under the bridge, or they can not install Shore between the piers and the piers if the residential area of ​​the city center.; For the present invention, since by introducing a prestress to the steel mold required for casting and curing of the concrete can gyeomhage the function of the Shore become a steel material and concrete composite as a method to integrate the bridge compared with the conventional bridge expected middle finger ganhwa can, and Shore (base), so the process is omitted and the construction becomes easy advantage, regardless of the site conditions can be expected to improve the quality of construction of the production plant. In addition, installation of Shores, this dissolution step is omitted because the cross-section through the composite of Figure prestressed concrete and at the same time to be omitted steel dissolution process of the mold is also less economical efficiency can be secured technology.; In addition, in some cases, and also chaeulsu the concrete to the entire cross-section, when pouring concrete on the steel outer wall also serves as a role of the dice and the Shore is a hollow form a hollow so as to enable a more middle finger ganhwa than sikimeuroseo reduce the weight of the bridge It may fill the concrete. In addition, the economics are more favorable to secure the bridge type, if necessary continuous span There can also configure the girder streak.; In terms of aesthetic appearance, double-T girders is wonderful because it seems to be a variety of utilization such as highways and high-speed urban roads.
机译:为了在施工时将模具浇筑在现有的PSC(预应力混凝土)箱中,或者在PSC中建造双T形桥,是安装和拆卸模板Shore(模子放置支架)的必要过程。 。为此,现场的许多现场工作条件也需要尽可能多的变量。例如,它应该引入使用大型设备的另一种不经济的方法,因为穿过桥下的道路和河流,或者如果市中心居住区,它们不能在桥墩和桥墩之间安装岸边;对于本发明,由于通过将预应力引入到浇铸和固化混凝土所需的钢模中,可以使肖氏(Shore)功能成为钢材和混凝土复合材料的一种方法,与传统桥梁预期的中间桥梁相比,该桥梁成为一体的方法。手指ganhwa罐和Shore(基座),因此省略了该过程,使施工变得容易,无论场地条件如何,均可提高生产工厂的施工质量。另外,在肖氏的安装中,该溶解步骤被省略,因为通过预应力混凝土的复合材料的横截面图和同时被省略的模具的钢溶解过程也较经济,可以确保技术效率的降低。另外,在某些情况下,也可以在整个横截面上使用混凝土,当在混凝土外壁上浇筑混凝土时,也可以起到骰子的作用,而肖氏是空心的,形成空心,从而可以中指ganhwa比sikimeuroseo减轻了桥的重量它可能会填充混凝土。另外,经济上更有利于确保桥梁类型,如果需要连续跨度,还可以配置大梁条纹。就美学外观而言,双T型梁很棒,因为它似乎是多种用途的,例如高速公路和高速城市道路。

著录项

  • 公开/公告号KR200341053Y1

    专利类型

  • 公开/公告日2004-02-11

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20030010061U

  • 发明设计人 박대열;

    申请日2003-04-02

  • 分类号E01D2/00;

  • 国家 KR

  • 入库时间 2022-08-21 22:46:22

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号