首页> 外国专利> Procedure for building of supporting wall uses construction elements with cavity of one element aligning with cavity of at least one element lying above it in overlap, with cavities filled with locally available material

Procedure for building of supporting wall uses construction elements with cavity of one element aligning with cavity of at least one element lying above it in overlap, with cavities filled with locally available material

机译:建造支撑墙的程序使用以下结构构件:一个构件的空腔与重叠放置在其上方的至少一个构件的空腔对齐,并且空腔填充有当地可用的材料

摘要

The procedure for the building of a supporting wall involves the use of bearing construction elements with at least on vertically continuous cavity and which are orientated so that a cavity of one construction element aligns with the cavity of at least one construction element lying above it in overlap, and the overlying cavities are filled with an insulating and moisture regulating material (2,2'). The material can be produced from locally available materials from the building site itself and may be clay from the soil excavation and wood chips from the clearing work. An Independent claim is included for a construction element in which the component parts of the filling material are mixed with one or more solvents and the filling material is hardened by the release of the solvent.
机译:建造支撑墙的过程包括使用至少在垂直连续的空腔上且方向定向的轴承建筑构件,以使一个建筑构件的空腔与重叠在其上方的至少一个建筑构件的空腔对齐。 ,上面的空腔中充满了绝缘和调湿材料(2,2')。该材料可以从建筑工地本身的本地可用材料中生产,也可以是土壤开挖中的黏土和清理工作中的木屑。对于建筑元件包括独立权利要求,其中填充材料的组成部分与一种或多种溶剂混合,并且填充材料通过释放溶剂而硬化。

著录项

  • 公开/公告号DE10230963A1

    专利类型

  • 公开/公告日2004-02-12

    原文格式PDF

  • 申请/专利权人 MASCHINEN- UND ANTRIEBSTECHNIK GMBH & CO. KG;

    申请/专利号DE2002130963

  • 发明设计人 MAHRWALD JUERGEN;

    申请日2002-07-10

  • 分类号E04B2/86;E04C1/39;