tr & auml; eng to backup sp & t.; lgut in sp and professional; lmaschinen, period: & ndash; a pipe (1) for directives and professional;; of reinigungsfl & t.; ssigkeit, & ndash; a stopper (2), at one end of the tube (1) is arranged, and the one with the pipe communicating passage and a d & t.; se trained & opening in all;& ndash; a & t.; on a b & t.; gel (4) with the unit fully the stopper (2) and the pipe (1) connected attack (5) of the stopper (2) in which a aufnahmebereich limited to sp & t.; paid in and to be paid in part can be absorbed, and & ndash; a spannmitte (3) through which the abst and between attack (5) and a stopper (2) is elastic (& auml; ngerbar.
展开▼