首页> 外国专利> Conversion of dredged silt into trench filling material by sieving, draining and mixing with used foundry sand, cement and polymer fibers

Conversion of dredged silt into trench filling material by sieving, draining and mixing with used foundry sand, cement and polymer fibers

机译:通过筛分,沥干并与用过的铸造砂,水泥和聚合物纤维混合,将疏sil的淤泥转化为沟槽填充材料

摘要

Conversion of dredged silt into trench filling material procedure consists of taking dredges silt from rivers and other water courses, sieving it to remove foreign bodies, and storing it in tanks where it is covered and allowed to drain naturally to a given water content. Conversion of dredged silt into trench filling material procedure consists of taking dredges silt from rivers and other water courses, sieving it to remove foreign bodies, and storing it in tanks where it is covered and allowed to drain naturally to a given water content. The silt is then removed as required and transferred to the hopper of a mixing plant of the type used for concrete and mixed with used foundry sand, 4-10 mm slag granules, a special cement and polymer fibers, with added water if necessary. The mixture is transported in a concrete mixer truck to the site of use and tipped directly into a trench.
机译:将疏sil的淤泥转换为沟槽填充材料的过程包括:从河流和其他水道中抽取淤泥,将其过筛以清除异物,并将其存储在有盖的储罐中,并自然排水至给定的含水量。将疏sil的淤泥转换为沟槽填充材料的过程包括:从河流和其他水道中抽取淤泥,将其过筛以清除异物,并将其存储在有盖的储罐中,并自然排水至给定的含水量。然后根据需要将淤泥清除,并转移到用于混凝土的混合设备的料斗中,并与用过的铸造砂,4-10毫米的炉渣颗粒,特殊的水泥和聚合物纤维混合,并在必要时加水。混合物在混凝土搅拌车中运输到使用地点,并直接打入沟槽。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号