首页> 外国专利> COLUMN REMOVAL BEAM REINFORCING METHOD IN PARTITION PART SECTION AND BEAM REINFORCING STRUCTURE

COLUMN REMOVAL BEAM REINFORCING METHOD IN PARTITION PART SECTION AND BEAM REINFORCING STRUCTURE

机译:分隔部分截面和梁加固结构的柱拆除梁加固方法

摘要

PROBLEM TO BE SOLVED: To provide a column removal beam reinforcing method in a partition part capable of smoothly removing with ease a middle column erected in the middle section of the partition part.;SOLUTION: In the partition part 11 between adjacent rooms in a wooden building, a middle column 13 installed in the middle part of the partition part 11 and supporting a beam member 12 is removed, and the beam member 12 is reinforced. The method 10 for reinforcing the column removal beam is constituted of a process in which an assistant beam 15 is provided under the beam member 12 and attached in between the middle column 13 and the both side columns 14, a reinforcing band plate shaped steel framed beam 16 having a shorter length than the span L between both side columns 14 is fitted so as to straddle on both sides of the middle column 13 in the state covering the connection part 18 of the beam member 12 and the assistant beam 15 by the band plate part 17, and a process cutting and removing the lower part than the assistant beam 15 of the middle column 13.;COPYRIGHT: (C)2005,JPO&NCIPI
机译:解决的问题:提供一种在分隔部分中能够容易地平滑地去除竖立在该分隔部分的中间部分中的中柱的分隔部分的柱去除梁的方法。解决方案:在木制的相邻房间之间的分隔部分11中在该建筑物中,移除了安装在分隔部11的中间部分并支撑梁构件12的中间柱13,并且对梁构件12进行了加固。加强柱除去梁的方法10由以下过程构成:在梁构件12的下方设置辅助梁15,并在中柱13和两侧柱14之间安装辅助梁15,该加强带板状钢框架梁具有比两侧柱14之间的跨度L短的长度的图16所示的装置,以通过带板覆盖梁构件12的连接部18与辅助梁15的状态跨在中间柱13的两侧。部分17的切割和中间部分13的辅助梁15的下部的切除和移除。版权所有:(C)2005,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号