首页>
外国专利>
TEMPORARY BRIDGE PIER UNIT AND METHOD FOR CONSTRUCTING TEMPORARY BRIDGE PIER BY USING THE UNIT
TEMPORARY BRIDGE PIER UNIT AND METHOD FOR CONSTRUCTING TEMPORARY BRIDGE PIER BY USING THE UNIT
展开▼
机译:临时桥墩单元和使用该单元构造临时桥墩的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a temporary bridge pier unit which enables a temporary pier to be constructed in an extremely short period of time, and a method for constructing a temporary bridge pier by using the unit.;SOLUTION: A plurality of tubular bodies 11, a frame 12 and a receiving bag 13 are included as a unit in the temporary bridge pier unit 1. The unit 1 is constructed by installing the unit 1 in an installation place after the temporarily constructed unit 1 is transported to the target installation place by a carrier ship. The unit 1 is installed by bringing the plurality of tubular bodies 11 into contact with the bottom of a river, stabilizing each of the tubular bodies 11 via the receiving bag 13, and fixing each of the tubular body 11 and the frame 12 together after that.;COPYRIGHT: (C)2005,JPO&NCIPI
展开▼