首页> 外国专利> Welding hoop muscle around the vertical main reinforcement of the multiple manuals which are arranged on

Welding hoop muscle around the vertical main reinforcement of the multiple manuals which are arranged on

机译:围绕多个手册的垂直主筋焊接箍筋肌肉

摘要

PROBLEM TO BE SOLVED: To provide a working method for cast-in-place concrete piles in which a steel bar cage with hook portion formed to hoops can be produced easily and highly accurately, thereby a pile having a high strength can be built, and a carrying type steel bar bender can be produced.;SOLUTION: A steel bar cage is produced by welding hoops around a plurality of longitudinal main bars arranged on an imaginary circle, this imaginary cage is erected in a pile hole formed in advance at a proposed portion for the pile installation, concrete is placed inside the pile hole, and this concrete is hardened by the cast-in-place working method for the concrete pile, a hook- shaped portion formed inwardly at the tip portion of the hoops is formed by bending the tip portion of the hoops after forming the hoops by winding the steel bars for hoops around the longitudinal main bar and before welding the hoops to the longitudinal main bars.;COPYRIGHT: (C)2002,JPO
机译:解决的问题:提供一种用于现浇混凝土桩的工作方法,其中可以容易且高精度地生产具有钩部形成为箍的钢筋笼,从而可以制造强度高的桩,并且解决方案:钢筋笼是通过将铁环焊接在假想圆上排列的多个纵向主钢筋周围而制成的,该假想笼被竖立在建议的预先形成的桩孔中用于桩的安装部分,将混凝土放置在桩孔内,并且通过用于混凝土桩的现浇工作方法使该混凝土硬化,在箍的末端部分处向内形成钩状部分,该钩状部分形成为:在将铁环用钢棒绕在纵向主杆上绕制形成铁环后,再将铁环焊接到纵向主杆上之前,弯曲铁环的顶端部分。;版权:(C)2002,JPO

著录项

  • 公开/公告号JP3686342B2

    专利类型

  • 公开/公告日2005-08-24

    原文格式PDF

  • 申请/专利权人 植田基工株式会社;

    申请/专利号JP20010039118

  • 发明设计人 植田 邦夫;

    申请日2001-02-15

  • 分类号E02D5/34;B21F1/00;B21F31/00;E04G21/12;

  • 国家 JP

  • 入库时间 2022-08-21 22:28:36

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号