首页>
外国专利>
The occasion where the additional strength
The occasion where the additional strength
展开▼
机译:附加力量之际
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To heighten the accuracy of a vertical wall surface by restraining earth pressure to a wall surface panel by forming a buffer space surrounded with a net on the back side of a wall surface panel to absorb the earth pressure or banking to the panel in the buffer space, and filling the space with concrete. ;SOLUTION: A wall surface panel 3, the back of which is surrounded with a net and provided with a reinforcing material 2 is installed to perform banking, and the wall surface panel 3 is further stacked to further pile up banking 1. In this case, for sinking of the banking 1, the reinforcing material 2 is displaced by a slide joint 6 to deal with such sinking. Further, concerning earth pressure, the net 7 is deformed and recessed to the buffer space side to transmit the earth pressure to the wall surface panel 3. After that, at the stage when the banking 1 is settled, the buffer space is filled with broken stones or concrete 9 to fill up the space and the integrated with the banking 1 and the wall surface panel 3. Thus, the earth pressure in banking 1 is restrained as much as possible to form the vertical wall surface on the wall surface panel 3 with good accuracy.;COPYRIGHT: (C)1999,JPO
展开▼