首页> 外国专利> A train corridor scheduling process including a balanced feasible schedule cost function

A train corridor scheduling process including a balanced feasible schedule cost function

机译:包含均衡可行调度成本函数的火车走廊调度过程

摘要

A process for scheduling the travel of trains on a rail corridor. The rail corridor includes a plurality of siding tracks onto which trains can be sided when a meet or pass occurs with another train on the corridor. A gradient search process is used with a cost function to determine the optimum schedule by moving each meet and pass to a siding. The individual train schedules are varied by changing train speed and/or the train departure time (i.e., the time at which the train enters the corridor).
机译:安排火车在铁路走廊上行驶的过程。铁路走廊包括多个壁板轨道,当与另一列火车在走廊上相遇或通过时,列车可以侧向站在这些轨道上。将梯度搜索过程与成本函数一起使用,以通过移动每个集结并移至一边来确定最佳计划。通过改变火车速度和/或火车出发时间(即火车进入走廊的时间)来改变各个火车时间表。

著录项

  • 公开/公告号AU781542B2

    专利类型

  • 公开/公告日2005-05-26

    原文格式PDF

  • 申请/专利权人 GE TRANSPORTATION SYSTEMS GLOBAL SIGNALING LLC;

    申请/专利号AU20010030850

  • 发明设计人 JOHN R. DONER;

    申请日2001-01-02

  • 分类号B61L27/00;G06F17/60;

  • 国家 AU

  • 入库时间 2022-08-21 22:12:55

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号