首页> 外国专利> METHOD FOR IMPROVING BONDING RIGIDITY OF CONCRETE BY REMOVING DEFECT CONCRETE BEFORE FINISHING CURING AFTER POURING CONCRETE PRIMARILY

METHOD FOR IMPROVING BONDING RIGIDITY OF CONCRETE BY REMOVING DEFECT CONCRETE BEFORE FINISHING CURING AFTER POURING CONCRETE PRIMARILY

机译:灌注混凝土后精加工养护前去除缺陷混凝土以提高混凝土粘结刚度的方法

摘要

PURPOSE: An improvement method of bonding rigidity of concrete is provided to reduce working hours, to cut down construction cost, and to decrease the construction period by easily removing the defect portion of concrete before finishing curing concrete after pouring first concrete. CONSTITUTION: First concrete is poured primarily, and concrete is cured for 9 to 12 hours. Laitance, dust and defective concrete are eliminated from the surface of the first concrete to expose the concrete aggregate by using a water jet and an air compressor while curing concrete. Second concrete is poured and cured secondarily after removing defective concrete. Bonding strength of concrete is improved by easily removing defective concrete while pouring and curing concrete.
机译:目的:提供一种改善混凝土粘结刚度的方法,以减少工作时间,降低施工成本并缩短工期,方法是在浇筑第一个混凝土后完成固化混凝土之前轻松去除混凝土的缺陷部分。组成:首先浇筑混凝土,然后固化9至12个小时。通过在固化混凝土的同时使用喷水器和空气压缩机将浮浆,灰尘和有缺陷的混凝土从第一混凝土的表面消除,从而露出混凝土骨料。去除缺陷混凝土后,再浇筑第二混凝土并进行养护。通过在浇筑和固化混凝土时轻松去除有缺陷的混凝土,可以提高混凝土的粘结强度。

著录项

  • 公开/公告号KR20050008202A

    专利类型

  • 公开/公告日2005-01-21

    原文格式PDF

  • 申请/专利权人 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO. LTD.;

    申请/专利号KR20030048058

  • 发明设计人 KIM DAE JOONG;

    申请日2003-07-14

  • 分类号E04G21/02;

  • 国家 KR

  • 入库时间 2022-08-21 22:06:00

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号