首页> 外国专利> FRONT BUILT-UP TYPE INSPECTION PATH STRUCTURE OF SLOPE OF ROAD, INCLUDING UPPER AND LOWER FOOT STEP INSTALLATION FRAMES, POLYETHYLENE FOOTSTEPS, RAILING POSTS, INTERMEDIATE RECIPROCATING RODS, HEIGHT ADJUSTMENT FIXING ANCHORS, AND RAILS

FRONT BUILT-UP TYPE INSPECTION PATH STRUCTURE OF SLOPE OF ROAD, INCLUDING UPPER AND LOWER FOOT STEP INSTALLATION FRAMES, POLYETHYLENE FOOTSTEPS, RAILING POSTS, INTERMEDIATE RECIPROCATING RODS, HEIGHT ADJUSTMENT FIXING ANCHORS, AND RAILS

机译:道路边坡的前固定式检查路径结构,包括上下脚踏板安装框架,聚乙烯脚踏板,起跑柱,中间往复杆,高度调整固定锚固件和铁路

摘要

PURPOSE: A front built-up type inspection path structure of a slope of a road is provided to enable simple construction, to reduce the construction cost, to enable free application to a gradient of the slope, and to reduce the maintenance cost. CONSTITUTION: A front built-up type inspection path structure of a slope of a road comprises upper and lower footstep installation frames(100,100') having plural bolt holes(110,110') in the longitudinal direction; polyethylene footsteps(200) combined to the upper and lower footstep installation frames with inclination; railing posts(300) each having a rail installation part(310) formed in a bent shape to the upper part; intermediate reinforcing rods(400) having plural bolt holes(410) to be closely fastened to bolt holes(330) of the lower parts of the railing posts, to adjust the height of the railing posts; height adjustment fixing anchors(500) closely fastened to the outside of the intermediate reinforcing rods; and rails(600) having plural bolt holes(610) in the longitudinal direction. The upper and lower footstep installation frames are seated on the slope. A slide-preventing part(210) of a thread type is formed to the upper part of the polyethylene footstep. Grid-shaped side parts(220) are formed on the sides of the slide-preventing part. Plural bolt holes(230) are formed in the grid-shaped side parts. The polyethylene footsteps are fastened to the bolt holes of the upper and lower footstep installation frames by fastening bolts(150). A bolt hole(320) is formed in the rail installation part. The intermediate reinforcing rod and the height adjustment fixing anchor are fastened to the bolt holes of the lower part of the railing post by fastening bolts(550). The height adjustment fixing anchor has a square body part(510) and an anchor pin(530) integrally formed. The rail is fastened to the rail installation part of the railing post by fastening bolts(650).
机译:目的:提供一种道路的斜坡的前建式检查路径结构,以使得施工简单,降低建造成本,可以自由应用到斜坡的坡度上并减少维护成本。组成:一种道路斜坡的前建式检查通道结构,包括上下脚步安装框架(100,100'),在纵向上具有多个螺栓孔(110,110');聚乙烯脚踏板(200)以倾斜的方式结合到上下脚踏板安装框架上;栏杆立柱(300)具有在其上部弯曲形成的轨道安装部(310)。中间加强杆(400)具有多个螺栓孔(410),该多个螺栓孔(410)紧密地固定到栏杆下部的螺栓孔(330),以调节栏杆高度。高度调节固定锚(500)紧密固定在中间加固杆的外侧;导轨(600)在纵向上具有多个螺栓孔(610)。上下脚步安装框架位于斜坡上。在聚乙烯脚踏板的上部形成有螺纹状的防滑部(210)。在滑动防止部的侧面形成有格子状的侧面部(220)。在格子状的侧部形成有多个螺栓孔230。聚乙烯脚踏板通过紧固螺栓(150)固定在上下脚踏板安装框架的螺栓孔上。在轨道安装部上形成有螺栓孔(320)。通过紧固螺栓(550)将中间加强杆和高度调节固定锚固定在栏杆下部的螺栓孔上。高度调节固定锚具有一体形成的方形主体部分(510)和锚销(530)。导轨通过紧固螺栓(650)固定到护栏的导轨安装部分。

著录项

  • 公开/公告号KR20050008298A

    专利类型

  • 公开/公告日2005-01-21

    原文格式PDF

  • 申请/专利权人 LEE KI JAE;

    申请/专利号KR20030048202

  • 发明设计人 LEE KI JAE;

    申请日2003-07-15

  • 分类号E04G27/00;

  • 国家 KR

  • 入库时间 2022-08-21 22:05:58

获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号