首页> 外国专利> METHOD FOR PRE-CONSTRUCTING STAIRCASE IN BUILDING AND PC MEMBER THEREFOR

METHOD FOR PRE-CONSTRUCTING STAIRCASE IN BUILDING AND PC MEMBER THEREFOR

机译:建筑物中预构建楼梯的方法及其PC构件

摘要

The present invention relates to a precast concrete member used in the method of the line installation of the staircase structure and a construction method,; Installation phase of the left stairs practical PC wall members (1) and the installation step, the right staircase practical PC wall members (3) of the; And bonding step of the respective side connecting portion of the rear staircase practical precast concrete wall elements (4) installed; and the left and right stairs practical PC wall members 1, 3 and rear staircase practical PC wall members (4), the intermediate landings for the bonding step of the precast concrete element 5, and a second bonding step of the first step-PC member 7 and the bonding step, the second floor landing half slab precast concrete member (8) for the; The bonding step of the precast concrete element (9) for the second step; The step of pouring concrete on-site on the upper surface of a concrete portion and; The steps for installing the conventional glass window frame 11, the glass plate is installed fixed to staircase construction of one layer is completed by; It is one to perform a process of construction by the construction process as described above prior to the construction of the reference layer (B) so that the staircase is built of at least two layers and over again to the top floor.; According to the present invention can be utilized for construction costs and steps to simplify the construction work to be able to build a staircase (A) in a short period of time, passage of doemeun Of course, the operator can be utilized to transport passage of the materials required for the construction prior art as there is an effect that eliminates the need for an installation for the passage of the operator.
机译:本发明涉及一种用于楼梯结构的线路安装方法中的预制混凝土构件及其施工方法;左楼梯实用PC墙构件的安装阶段(1)和安装步骤,右楼梯实用PC墙构件的安装步骤(3);并分别在后楼梯的各侧连接部分的粘结步骤中安装实用的预制混凝土墙构件(4);左,右楼梯实用PC墙构件1、3和后楼梯实用PC墙构件(4),预制混凝土构件5的粘结步骤的中间平台以及第一步PC构件的第二粘结步骤参照图7及粘接步骤,将第二层楼板的半混凝土楼板预制混凝土构件(8)为;将预制混凝土元件(9)的粘结步骤用于第二步骤;在混凝土部分的上表面上现场浇筑混凝土的步骤;以及安装常规玻璃窗框11的步骤是,将玻璃板安装固定到楼梯的一层构造完成;一种方法是在构造参考层(B)之前,通过如上所述的建造过程执行建造过程,以使楼梯至少由两层建造,并再次到达顶层。根据本发明,可以利用建筑成本和步骤来简化建筑工作,以便能够在短时间内建造楼梯(A)。通过当然,可以利用操作员来运输楼梯的通道。由于具有消除了操作员通过的安装的需要的效果,因此可以节省构造现有技术所需的材料。

著录项

  • 公开/公告号KR20050048298A

    专利类型

  • 公开/公告日2005-05-24

    原文格式PDF

  • 申请/专利权人 SAMSUNG CORPORATION;

    申请/专利号KR20030082201

  • 发明设计人 CHOI MYOUNG SIG;KIM ICK BAE;LEE GANG CHUL;

    申请日2003-11-19

  • 分类号E04F11/02;

  • 国家 KR

  • 入库时间 2022-08-21 22:05:19

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号