首页> 外国专利> MANAGEMENT METHOD OF MATERIAL SUPPLY CONNECTING TO WEEKLY PERFORMANCE PLAN WHEN VESSEL IS CONSTRUCTED

MANAGEMENT METHOD OF MATERIAL SUPPLY CONNECTING TO WEEKLY PERFORMANCE PLAN WHEN VESSEL IS CONSTRUCTED

机译:建造船舶时物料供应与每周性能计划的管理方法

摘要

The present invention leads accordance to apply for and, more particularly, material application contact the principal the materials of each department needed materials you go through the shipbuilding project, each department relates to materials supply management methods that work and weekly action plans when shipbuilding time relates to materials supply management methods that work and ship-week action plan during the drying process to prevent a delay in (Lead time) mihwakbo.; The purpose of the present invention, materials applications and disseminate without relying operations manager, operations foreman of each department, cows schedule planning a weekly action plan in accordance with the planning staff (work) is the next minute materials according to the weekly action plans a, and the material supply management bangbeopreul provides that interworking and weekly action plans during ship that can prevent a process delay in materials delivery by request to purchase a certain day.; The present invention in order to achieve the above objectives, the ship s forward and estimates in the survey at the same time, sales design and thus the production plan is for scheduling and while a broken it forward planning and cattle sewoomyeo the schedule, said while a positive plan a purchase request in accordance with, and in accordance with the cow schedule and weekly production plan is material to wear in the ship when the ship materials supply management methods for drying,; The method comprising the weekly production planning management personnel to establish the date of the application materials in accordance with the above-week production schedule,; The method comprising the materials needed for the next day, depending on the application management of the materials according to the production planning application one week on a regular day of the week,; To manage the pallet of the material to be dressed in the next supplied to the yard to progress the production in order to match the above-described application is characterized in that to prevent the delay of the ship construction schedule.
机译:本发明导致申请,更具体地讲,材料申请与负责您造船项目的每个部门的材料联系,每个部门涉及工作时的材料供应管理方法和每周行动计划在干燥过程中使用的材料供应管理方法和船周行动计划,以防止延迟(交货时间)mihwakbo。本发明的目的是,不依赖作业管理者,各部门的作业负责人,母牛按照计划人员(工作)计划每周行动计划的材料的应用和散布是根据每周行动计划的下一分钟材料。 ,并且物料供应管理bangbeopreul提供了在船运期间的互通和每周行动计划,该计划可以防止因要求购买某天而导致物料交付过程延迟。为了实现上述目的,本发明同时在检验中前进和估计船舶,销售设计以及因此生产计划用于调度,而破损的前进计划和sewoomyeo调度在计划中,一个积极的计划,是在船舶物料供应管理方法进行干燥时,根据购买要求,以及按照母牛计划和每周生产计划在船上所穿的物料;该方法包括:每周的生产计划管理人员根据上周的生产时间表确定申请材料的日期;该方法包括:在一周的正常一天的一个星期内,根据生产计划应用,根据对材料的应用管理,进​​行第二天所需的材料;为了与上述应用相匹配,管理接下来要供应给船坞的待修整材料的托盘以进行生产以匹配上述应用,其特征在于防止了船舶建造进度的延迟。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号