首页> 外国专利> Solid type Arch bridge using steel frame construction and this style of construction

Solid type Arch bridge using steel frame construction and this style of construction

机译:实心型拱桥,采用钢框架结构和这种结构

摘要

The present invention relates to charge and doubles arch and construction method using the iron, and its object is Reinforcement alternating with piers and building arch ribs in steel-reinforced structure, jucheolgeun of straight in the width direction of the reinforcement when the bridge of the arch rib and, after the production according to the arch of the bridge connects with jucheolgeun the booster reinforced in the longitudinal direction of the bridge reinforcement and pouring concrete arch in steel-reinforced structure the front of the lip to eliminate the curve difficulty of processing and reinforcement of jucheolgeun, concrete and steel the entire reinforcement structure is integrated to provide a charging and doubles arch and construction method using the iron which is capable of supporting the loads that are given to the bridge safely.; The present invention for achieving the above object, the rebar 5, the reinforcement and by pouring concrete steel-reinforced concrete structure alternately 16 and the piers 17 and the abutment 16 and the angle of intersection formed by the iron (17) in a plurality of arcuate H-beam (2), a width of one end ends in a direction perpendicular to the upper side of the compression jucheolgeun 7, the lower side of the tension jucheolgeun 3 of the arcuate H-beam (2) bridge coupled to the to the other end once reinforcement in a straight line, and the compressed jucheolgeun 7 and the tension jucheolgeun (3) respectively connected to be bent arcuately turned booster reinforcement 4, which is reinforcement in the longitudinal direction of the bridge and, on the tensile jucheolgeun 3 and the compression jucheolgeun ( 7) a connection with reinforced connection as to form an arched rib of steel-reinforced structure, to form the mold (8) and the Shore 9, the arch rib 1 and then installed by pouring concrete, concrete and integrating a, and the other chest wall the iron is formed by pouring concrete in the part 15 And that of the charge doubles arch construction and a method using a technical base.
机译:本发明涉及一种采用铁的装填和双拱拱门及施工方法,其目的是在钢筋混凝土结构中与墩墩交替建造建筑物的拱肋,当拱桥时在钢筋宽度方向上笔直肋骨,并根据桥拱生产后与jucheolgeun连接,将增强剂沿桥加强方向纵向加固,并将混凝土拱拱浇注在钢结构的前唇中,从而消除了加工和加固的曲线难度由jucheolgeun,混凝土和钢制成,整个增强结构被集成在一起,以提供装料和双拱,并使用铁建造方法,该铁能够安全地支撑桥所承受的载荷。为了实现上述目的,本发明的目的是,钢筋5,钢筋通过交替地浇注钢筋混凝土结构16和桥墩17和桥台16以及由铁17形成的交点角而形成。弓形H型梁(2),其一端的宽度在垂直于压缩jucheolgeun 7上侧的方向上终止,弓形H型梁(2)桥的张紧jucheolgeun 3的下侧连接至另一端一旦成一直线,则压缩的水龙骨7和拉力水龙(3)分别连接以弯曲弯曲成弧形的加强筋4,该增强物在桥的纵向方向上,并在拉力水龙3上与压紧的jucheolgeun(7)进行加强连接,以形成钢加强结构的拱形肋,形成模具(8)和Shore 9,然后通过浇注安装拱形肋1通过在第15部分中浇注混凝土来形成混凝土,混凝土和一体的铁,以及另一块胸壁的铁。装药的铁塔采用双拱结构和使用技术基础的方法。

著录项

  • 公开/公告号KR100469840B1

    专利类型

  • 公开/公告日2005-02-21

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20020058607

  • 发明设计人 김정일;김동립;

    申请日2002-09-27

  • 分类号E01D4/00;

  • 国家 KR

  • 入库时间 2022-08-21 22:04:12

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号