首页>
外国专利>
Method for constructing bank protection in soft ground of river-mouth or the seaside
Method for constructing bank protection in soft ground of river-mouth or the seaside
展开▼
机译:在河口或海边软土地基上建设堤防的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
Hoangong construction method according to the present invention haguna soft soil of the shore in accordance with the will, haguna be spaced from each other by a predetermined interval a plurality of peg members on soft ground comprising: a shore-type in two rows; The step of cutting the height of the upper end of the pile member to a certain type; The step of fastening a connector for even distribution and maintain the flatness of the supporting force on the upper end of the two pile members facing each other belonging to different columns of the pile member, respectively; Between the precast production a base block neighboring a block with a connection means provided on both sides thereof for connection to each other comprising: mounting on said peg element; Rammer stage to the upper surface height of the base block mounted on the peg member to the flat and laid on a riprap and forth sides of peg member; Up to a predetermined building blocks for the shore protection on the mounting base comprising: a block height of the first laminated construction; The primary laminated laying the soil erosion preventing radiation to the back sheet and pile riprap compaction flat portion of the upper surface of the rear member constructed structure, and filled with earth and sand in the back of the radiating sheet comprising: a backfill; And primary and laminated construction to a laminated building block for back over the built structure a predetermined height, and laying the radiation sheet on a rear portion of the construction structures, hoangong by the step of filling backfill of earth and sand carried out a plurality of times repeatedly in the back of the radiating sheet of a step of completing the construction.
展开▼